Bieżące utrzymanie i konserwacja infrastruktury kolejowej wraz z odśnieżaniem zmechanizowanym sprzętem odśnieżnym linii nr 317 na odcinku GRYFÓW ŚLĄSKI - MIRSK - ŚWIERADÓW ZDRÓJ od km 0,668 do km 16,544
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
40 / 100
Risk factors
SWZ not analyzed; conditions for eligibility, technical requirements, and contract terms unknown.
Bid bond forfeiture if bid is withdrawn or contract not signed.
Submission deadline in 7 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Services contract
- 1 lot
- Duration until Dec 2029
- Routine maintenance and conservation of railway infrastructure on line 317
- Mechanized snow removal using snow-clearing equipment
Show full summary
Open tender for railway track maintenance and snow removal services on line 317 in Poland. Single lot, price-only award, bid bond 70,000 PLN, deadline 2026-07-01. Estimated value not disclosed. Procurement documents (SWZ) not analyzed.
Risks
SWZ not analyzed; conditions for eligibility, technical requirements, and contract terms unknown.
Bid bond forfeiture if bid is withdrawn or contract not signed.
Submission deadline in 7 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Open procedure
Administrative
- Electronic submission required via Open portal
- Submission language: Polish
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
Dolnośląska Służba Dróg i Kolei we Wrocławiu
Location
Wrocław, POL
Website
Buyer profile
Identifier
931934644
Lots (1)
LOT-0001
Bieżące utrzymanie i konserwacja infrastruktury kolejowej wraz z odśnieżaniem zmechanizowanym sprzętem odśnieżnym linii nr 317 na odcinku GRYFÓW ŚLĄSKI - MIRSK - ŚWIERADÓW ZDRÓJ od km 0,668 do km 16,544
Routine maintenance and conservation of railway infrastructure including mechanized snow removal on line 317 from km 0.668 to km 16.544, section Gryfów Śląski - Mirsk - Świeradow Zdrój. Detailed scope in SWZ.
Location
Duration
Category
Selection criteria
Deadline
Award details
Show original TED data
Original TED description
Bieżące utrzymanie i konserwacja infrastruktury kolejowej wraz z odśnieżaniem zmechanizowanym sprzętem odśnieżnym linii nr 317 na odcinku GRYFÓW ŚLĄSKI - MIRSK - ŚWIERADÓW ZDRÓJ od km 0,668 do km 16,544. Szczegółowy opis przedmiotu zamówienia zawiera Specyfikacja Warunków Zamówienia.
Procurement Details
- Publication date
- 20 May 2026
- Notice type
- Contract notice — standard
- Languages
- Polish
Reference metadata
- Notice subtype
- 16
- Notice version
- 1
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 347068-2026
- Source notice ID
- b65b294c-8e4d-4b95-9294-9e32e81609df
Documents (1)
Similar tenders
Croatia – Railway-track maintenance services – Mehaničko čišćenje pružnog pojasa od raslinja i drveća na području PRJ HŽI Centar NS Zagreb
Poland – Railway-track maintenance services – Bieżące utrzymanie i konserwacja infrastruktury kolejowej wraz z odśnieżaniem zmechanizowanym sprzętem odśnieżnym linii nr 341 na odcinku Bielawa Zachodnia-Dzierżoniów od km -0,159 do km 5,118.,
Poland – Railway-track maintenance services – Bieżące utrzymanie i konserwacja infrastruktury kolejowej wraz z odśnieżaniem zmechanizowanym sprzętem odśnieżnym linii kolejowej nr 311 na odcinku Szklarska Poręba Górna - Granica Państwa od km 29,844 do km 43,138.
Poland – Railway-track maintenance services – Świadczenie usług związanych z bieżącym utrzymaniem nawierzchni kolejowej PGE GiEK S.A. Oddział Elektrownia Opole
Hungary – Railway-track maintenance services – Különböző típusú balízok le-és felszerelése
Ireland – Public transport services by railways – MetroLink M500 Service Delivery Partner
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
40 / 100
Risk factors
SWZ not analyzed; conditions for eligibility, technical requirements, and contract terms unknown.
Bid bond forfeiture if bid is withdrawn or contract not signed.
Submission deadline in 7 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications