Tenderwize
Back to tender search

North Sea I, South, Offshore Wind Farm

Danish Energy Agency·København V, Denmark·DKK 6600M | EUR 883M·Deadline Oct 02, 2028 · 831 days left·Open·Works
High valueStructured notice only
60/100

Opportunity Score

Needs reviewHigh complexity
WorksOpen
Why this score?

Opportunity

60 / 100

Complexity

90 / 100

Risk factors

Concessionaire bears costs for construction, operation, decommissioning, and overplanting, with no cap on payments to s...

Minimum capacity must be established by 31 Dec 2034; delays may lead to penalties. Extension possible but not guarantee...

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • DKK 6600M estimated value
  • Works contract
  • 1 lot
  • Duration 40 YEAR
  • Design, financing, construction, operation, and decommissioning of an offshore wind farm with minimum capacity of 1 GW
  • Connection to Danish transmission grid is voluntary
Show full summary

This is an open procedure for a concession to establish and operate a 1 GW offshore wind farm (North Sea I, South) in the Danish North Sea. The project is supported by a capability-based two-way contract for difference (CfD) for 20 years, with a subsidy cap of 6.6 billion DKK (2025 prices). The concessionaire bears all commercial risks except for certain defence-related costs and preliminary investigations. The award criterion is the lowest bid price (DKK/MWh). The tender requires a minimum of one reference for a large-scale offshore energy project with CAPEX ≥ 500M DKK, ≥ 10m water depth, ≥ 25-year duration. The submission deadline is 23 October 2028 at 14:00 local Danish time. Only the first lot (LOT-0000) is detailed; additional lot entries lack titles, descriptions, and deadlines, indicating a data extraction issue.

Risks

Concessionaire bears costs for construction, operation, decommissioning, and overplanting, with no cap on payments to s...

Minimum capacity must be established by 31 Dec 2034; delays may lead to penalties. Extension possible but not guarantee...

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Administrative

  • Bid price (DKK/MWh) must be offered in Tender Submission Letter; award to lowest bid price
  • Tender validity period: 8 months from submission deadline, extendable upon request
  • ESPD required as preliminary proof; full documentation upon request

Requirements may be incomplete.

Award Criteria

Lot 1

Award of the Concession Agreement to the most economically advantageous tender will take place on the basis of the award criterion, “price”. The award criterion, “price”, will be assessed on the basis of the bid price offered by the Tenderer in the Tender Submission Letter (Annex A), in the Procurement Specifications. The offered bid price must constitute a price per unit of electricity in “DKK”/MWh excl. VAT, which the Tenderer will be guaranteed for the duration of the 20-year subsidy period. The bid price of the Successful Tenderer will constitute the so-called “strike price” under the Concession agreement, cf. Appendix F (Concession Agreement) and Appendix 3 (Capability-Based Two-Way Contract for Difference). The Tenderer submitting the tender with the lowest offered bid price will be awarded the right and obligation to establish an offshore wind farm in the concession area, as set out in Appendix 2 (Location of the Concession Area)100%

Buyer

Name

Danish Energy Agency

Location

København V, DNK

Website

ens.dk/

Buyer profile

Open profile

Identifier

59778714

Lots (1)

LOT-0000

North Sea I, South, Offshore Wind Farm

Establishment and operation of one offshore wind farm with minimum capacity of 1 GW, including optional overplanting and potential for innovative energy production (e.g., Power-to-X). The concession area is in the Danish North Sea (NUTS: DK041). The concession agreement has a duration of 40 years, with a 20-year CfD subsidy period.

WorksEU fundedElectronic submission

DKK 6.6B

Estimated value

Location

DK041, Denmark

Duration

40 YEAR

Category

Construction work

Selection criteria

Price

Deadline

Deadline Oct 23, 2028

Procurement Details

Publication date
20 Nov 2025
Notice type
Contract notice — standard
Languages
English

Reference metadata

Notice subtype
16
Notice version
1
Legal basis
32014L0024

Reference IDs

Tender ID
774914-2025
Source notice ID
905814ce-797a-435d-8033-d8295b67998f

Documents (1)

Similar tenders