Budowa węzła przesiadkowego – Plac Kotlarza w ramach zadania „Rozwój infrastruktury mobilności miejskiej na terenie Obszaru Funkcjonalnego Radomia – Etap I”

Miejski Zarząd Dróg i Komunikacji w Radomiu·Radom, Poland·Deadline Jul 21, 2026 · 27 days left·Open·Works
Structured notice only
65/100

Opportunity Score

PromisingMedium complexity
WorksOpen
Why this score?

Opportunity

65 / 100

Complexity

60 / 100

Risk factors

No estimated value available, making it difficult to assess budget adequacy and bid competitiveness.

Utility relocations and traffic signal integration require coordination with multiple utility owners and may cause dela...

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Strong opportunity

Key Facts

  • Works contract
  • 1 lot
  • Duration 10 MONTH
  • Construction of road infrastructure (400 m length) including demolition, earthworks, pavement layers, asphalt road and bike paths, concrete block driveways and sidewalks, granite bus bays.
  • Finishing works: adjustment of manholes and valves, vertical and horizontal signage, landscaping.
Show full summary

This tender is for the construction of a multimodal transfer hub (Plac Kotlarza) in Radom, Poland, as part of a larger urban mobility infrastructure project co-financed by the European Regional Development Fund. The scope includes road works (400 m), demolition, construction of roads, bike paths, sidewalks, bus bays, green areas, relocation of utility networks, installation of passenger information systems and ticket machines, and traffic signal upgrades. The tender is an open procedure with a single lot, electronic submission required, and language Polish only. Estimated value is not disclosed. Duration is 10 months. Award criteria: price 70%, experience of proposed road construction manager 20%, warranty period 10%. Key eligibility: experience in at least one road project of min. 200 m including lighting within last 5 years, and qualified personnel.

Risks

No estimated value available, making it difficult to assess budget adequacy and bid competitiveness.

Utility relocations and traffic signal integration require coordination with multiple utility owners and may cause dela...

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Bid bond of PLN 44,000.00 required.

Administrative

  • Electronic submission via e-Zamówienia platform.
  • Offer must be in Polish and signed with a qualified electronic signature.

Requirements may be incomplete.

Award Criteria

Lot 1

Cena70%

Buyer

Name

Miejski Zarząd Dróg i Komunikacji w Radomiu

Location

Radom, POL

Identifier

141100028

Lots (1)

LOT-0001

Budowa węzła przesiadkowego – Plac Kotlarza w ramach zadania „Rozwój infrastruktury mobilności miejskiej na terenie Obszaru Funkcjonalnego Radomia – Etap I”

Road construction works including demolition, road base, asphalt pavement, concrete block sidewalks, granite bus bays, utility relocations (electrical, telecom, heating, gas), installation of SDIP boards, ticket machines, bus shelters, and traffic signal updates. Length 400 m.

WorksEU fundedElectronic submission

Location

Radom, Poland

Duration

10 MONTH

Category

Road construction works

Selection criteria

Price

Deadline

Deadline Jul 21, 2026

Procurement Details

Publication date
16 Jun 2026
Notice type
Contract notice — standard
Languages
Polish

Reference metadata

Notice subtype
16
Notice version
1
Legal basis
32014L0024

Reference IDs

Tender ID
416251-2026

Documents (1)

Similar tenders