Construction of gas holder plants
Original notice title
Anlagenbau
Opportunity Score
Why this score?
Opportunity
40 / 100
Complexity
60 / 100
Risk factors
No estimated value or budget is specified in any source, making it difficult to assess financial viability or competiti...
All documents and submissions must be in German (DEU), which may exclude non-German speakers.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 2 lots
- Duration until Aug 2028
- Construction of a plant for hydrogen production
- CO2 capture from digester gas
Show full summary
Open procedure for plant construction (Anlagenbau) for hydrogen production, CO2 capture from digester gas, and methanol production at the Bottrop wastewater treatment plant. Part of R&D project E-BO(2)t. Award based 100% on price.
Risks
No estimated value or budget is specified in any source, making it difficult to assess financial viability or competiti...
All documents and submissions must be in German (DEU), which may exclude non-German speakers.
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Tender calculation using forms EFB-Preis and Preisblätter 221-222
- Proofs according to §6a EU No. 2 a)-c) VOB/A
Administrative
- Self-declaration according to Ziffer 3.2 of the circular from the Ministry of the Interior
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
Emschergenossenschaft
Location
Essen, DEU
Website
Identifier
Leitweg-ID: 05113-99003-97; USt.-ID: DE 119 823 752
Lots (2)
LOT-0000
Anlagenbau
Construction of a plant for hydrogen production, CO2 capture from digester gas, and methanol production at KA Bottrop.
Location
Duration
Category
Selection criteria
Deadline
Award details
Additional CPV codes
Value note
Show original TED data
Original TED description
Im Rahmen des Forschungs- und Entwicklungsvorhabens E-BO(2)t beabsichtigt die Emschergenossenschaft auf der KA Bottrop die Errichtung einer Anlage zur Wasserstoffproduktion, CO2 Abscheidung aus Faulgas und der Herstellung von Methanol. In dieser Vergabeeinheit wird der Anlagenbau angefragt.
Lot 2
Lot 2
Incomplete lot data - only additional classification CPV 45231112 provided, no description, title, or deadline.
Category
Value note
Procurement Details
- Publication date
- 15 Jun 2026
- Notice type
- Contract notice — standard
- Languages
- German
Reference metadata
- Notice subtype
- 16
- Notice version
- 1
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 413250-2026
Documents (2)
Similar tenders
Germany – Gas-fitting installation work – Technische Gase - GNUE Hochschule Anhalt, Standort Köthen - Forschungsbau "Interdisziplinares Forschungszentrum für eine nachhaltige Lebensmittelproduktion" (InFonaL) (OLB-2026-0278)
Czechia – Construction work for research buildings – Rekonstrukce laboratoří CEETe
France – Installation of pipe system – BTEX- Travaux de réfection des réseaux enterrés du site Duquesne
France – Hospital facilities construction work – EXTENSION ET RESTRUCTURATION DU SECTEUR DE LA CARDIOLOGIE INTERVENTIONNELLE DE L'HÔPITAL SAINTE MUSSE - TOULON
Poland – Repair and maintenance services of machinery – PRZEGLĄDY WGŁĘBNEGO WYPOSAŻENIA ODWIERTÓW KOMÓR EKSPLOATACYJNYCH W KPMG MOGILNO I KPMG KOSAKOWO
Poland – Works for complete or part construction and civil engineering work – Przebudowa budynku B Szpitala wraz z termomodernizacją
Opportunity Score
Why this score?
Opportunity
40 / 100
Complexity
60 / 100
Risk factors
No estimated value or budget is specified in any source, making it difficult to assess financial viability or competiti...
All documents and submissions must be in German (DEU), which may exclude non-German speakers.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications