ESTW Gießen stage 2 cable construction works
Original notice title
ESTW Gießen 2.Baustufe, Kabeltiefbau
Opportunity Score
Why this score?
Opportunity
45 / 100
Complexity
65 / 100
Risk factors
No budget or maximum contract value known; may lead to unrealistic pricing or insufficient funding.
Strict prequalification and declaration requirements; missing or incorrect documents can lead to exclusion.
Submission deadline in 6 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 3 lots
- Duration until Dec 2030
- Cable deep construction for electronic interlocking (ESTW) Gießen 2nd construction stage
- Installation of 190 signal foundations (rammed pipe foundations)
Show full summary
Open tender by DB InfraGO AG for cable deep construction works (Kabeltiefbau) as part of the ESTW Gießen 2. Baustufe project, divided into 4 lots covering different sections in and around Gießen, Germany. The contract includes signal foundations, cable ducts, track crossings, cable laying, and related works, with execution from November 2026 to December 2030. Award is based solely on price (100%), and electronic submission is required in German. No estimated contract value is disclosed.
Risks
No budget or maximum contract value known; may lead to unrealistic pricing or insufficient funding.
Strict prequalification and declaration requirements; missing or incorrect documents can lead to exclusion.
Submission deadline in 6 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Tenders for up to 4 lots are allowed, but variants are not permitted
Administrative
- Electronic submission via the DB Bieterportal is mandatory
- All submissions must be in German
Award Criteria
Lot 1
Lot 2
Lot 3
Lot 4
Buyer
Name
DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)
Location
Frankfurt Main, DEU
Identifier
fb197f94-7578-4673-8a57-4642ae120532
Lots (4)
LOT-0001
Los 1: Abschnitt Bf Gießen (Stellbereich FG)
Cable deep construction works for the Gießen station section (signaling area FG).
Location
Duration
Category
Selection criteria
Deadline
Award details
Show original TED data
Original TED description
Los 1: Abschnitt Bf Gießen (Stellbereich FG)
LOT-0002
Los 2: Abschnitt Bf Gießen Bergwald (a) – Bf Butzbach (a)
Cable deep construction works for the section from Gießen Bergwald (a) to Butzbach (a).
Location
Duration
Category
Selection criteria
Deadline
Award details
Show original TED data
Original TED description
Los 2: Abschnitt Bf Gießen Bergwald (a) – Bf Butzbach (a)
LOT-0003
Los 3: Abschnitt Bf Butzbach (Stellbereich FBZ)
Cable deep construction works for the Butzbach station section (signaling area FBZ).
Location
Duration
Category
Selection criteria
Deadline
Award details
Show original TED data
Original TED description
Los 3: Abschnitt Bf Butzbach (Stellbereich FBZ)
LOT-0004
Los 4: Abschnitt Dutenhofen
Los 4: Abschnitt Dutenhofen
Location
Duration
Category
Selection criteria
Award details
Procurement Details
- Publication date
- 15 Jun 2026
- Notice type
- Contract notice — standard
- Languages
- German
Reference metadata
- Notice subtype
- 17
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 410224-2026
Documents (1)
Similar tenders
Croatia – Railway construction works – Obnova dionice Sibinj-Slavonski Brod, dk i lk (2x7,3km), Andrijevci-Garčin lk (7,8km) i Strizivojna Vrpolje-Andrijevci dk (8,9km) i Strizivojna Vrpolje-Ivankovo dk i lk (2x21,3km) na pruzi M104 Novska-Tovarnik-DG
Germany – Electrical installation work – ZFB - Neubau eines Zentrums für Feuerwehrwesen und Bevölkerungsschutz
Germany – Railway construction works – SCHÖNEBECK-ELBE Umbau Verkehrsstation
Germany – Railway construction works – ESTW Wernberg-Köblitz Str 5860 - Erstellung Kabeltiefbauleistungen, bautechn. Anpassung 4 BÜ, 2 Lose
Poland – Construction work – Zaprojektowanie i wykonanie robót dla zadania pn.: "Prace na linii kolejowej C–E 20 na odcinku Pilawa - Łuków"
Poland – Construction work – Zaprojektowanie i wybudowanie linii kolejowej dużych prędkości od Węzła CPK (bez Węzła CPK) do Węzła Bolimowskiego (bez Węzła Bolimowskiego)
Opportunity Score
Why this score?
Opportunity
45 / 100
Complexity
65 / 100
Risk factors
No budget or maximum contract value known; may lead to unrealistic pricing or insufficient funding.
Strict prequalification and declaration requirements; missing or incorrect documents can lead to exclusion.
Submission deadline in 6 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications