Crossover Switches at Hamburg-Meckelfeld Node
Original notice title
Knoten HH-Meckelfeld, Überleitweichen Harburg
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
70 / 100
Risk factors
Works must be performed during strictly scheduled track possessions (mid-Aug to mid-Sep 2026 and further in 2027). Dela...
Removal of ISO joints is dependent on commissioning of new ESTW-A signalling system (planned Oct 2026). Delays in signa...
Submission deadline in 12 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 3 lots
- Duration until Oct 2027
- Installation of switches 48, 49, and 62 with substructure adjustments according to design plans.
- Adaptation and partial renewal of deep drainage and construction of concrete cable troughs in the switch area.
Show full summary
Open tender by DB InfraGO AG for railway track construction works in Hamburg, Germany, divided into 4 lots: superstructure (Lot 1), cable routing (Lot 2), drainage (Lot 3), and insulated joints (Lot 4). Work includes installing switches, adapting substructure, drainage, cable troughs, and removing ISO joints after new signalling system commissioning. Deadline: 13 July 2026. No estimated value provided. Award based on price only. Bidders must avoid conflicts with listed engineering firms and meet lot-specific prequalification or reference requirements.
Risks
Works must be performed during strictly scheduled track possessions (mid-Aug to mid-Sep 2026 and further in 2027). Dela...
Removal of ISO joints is dependent on commissioning of new ESTW-A signalling system (planned Oct 2026). Delays in signa...
Submission deadline in 12 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Administrative
- Electronic submission via DB Bieterportal required.
- Submission language: German only.
- Bids must include all required declarations as per notice sections 2.1, 2.1.4, and 5.1.6.
Award Criteria
Lot 1
Lot 2
Lot 3
Lot 4
Buyer
Name
DB InfraGO AG – Geschäftsbereich Fahrweg (Bukr 16)
Location
Frankfurt Main, DEU
Identifier
fb197f94-7578-4673-8a57-4642ae120532
Lots (4)
LOT-0001
Knoten HH-Meckelfeld, Überleitweichen Harburg - Los 1 Oberbau
Installation of switches 48, 49, 62 and adjustments to ballasted track superstructure. Requires DB prequalification for conventional ballasted track (strecken II, mixed traffic 121-160 km/h).
Location
Duration
Category
Selection criteria
Deadline
Award details
Show original TED data
Original TED description
Oberbau
LOT-0002
Knoten HH-Meckelfeld, Überleitweichen Harburg - Los 2 Kabelführungssystem
Cable routing systems including civil works and working under railway operations. Requires DB prequalification for cable routing systems.
Location
Duration
Category
Selection criteria
Deadline
Award details
Show original TED data
Original TED description
Knoten HH-Meckelfeld, Überleitweichen Harburg
LOT-0003
Knoten HH-Meckelfeld, Überleitweichen Harburg - Los 3 Entwässerung
Drainage works. Requires 3 reference projects of similar scope with railway infrastructure companies within the last 5 years.
Location
Duration
Category
Selection criteria
Deadline
Award details
Show original TED data
Original TED description
Knoten HH-Meckelfeld, Überleitweichen Harburg
LOT-0004
Knoten HH-Meckelfeld, Überleitweichen Harburg - Los 4 Isolierstöße
Knoten HH-Meckelfeld, Überleitweichen Harburg
Location
Duration
Category
Selection criteria
Award details
Procurement Details
- Publication date
- 14 Jun 2026
- Notice type
- Contract notice — standard
- Languages
- German
Reference metadata
- Notice subtype
- 17
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 407039-2026
- Source notice ID
- d9f6afc2-75f4-40a3-95b9-685ac3b57240
Documents (1)
Similar tenders
Germany – Railway construction works – SCHÖNEBECK-ELBE Umbau Verkehrsstation
Romania – Railway bridge construction work – ”POD CF NOU KM 317+950, LINIA CF DEDA – RĂZBOIENI ȘI DEMOLAREA PODULUI CF EXISTENT (EXECUŢIE)“ SRCF BRAȘOV
Poland – Construction work – Zaprojektowanie i wybudowanie linii kolejowej dużych prędkości od Węzła CPK (bez Węzła CPK) do Węzła Bolimowskiego (bez Węzła Bolimowskiego)
Poland – Construction work – Zaprojektowanie i wykonanie robót budowlanych dla zadania pn.: „Prace na linii kolejowej nr 179 na odcinku Tychy – Bieruń Stary” realizowanego w ramach Programu Fundusze Europejskie na Infrastrukturę, Klimat, Środowisko 2021-2027
Belgium – Track construction works – 57/52/2/25/359 - Projects North : Opbraak, aanleg en vernieuwing van sporen, spoortoestellen en overwegen in de provincies Oost-Vlaanderen, Antwerpen, Limburg en Vlaams-Brabant. Raamovereenkomst.
Germany – Track construction works – Volumenvertrag Gleis- und Weichenerneuerung Region Mitte
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
70 / 100
Risk factors
Works must be performed during strictly scheduled track possessions (mid-Aug to mid-Sep 2026 and further in 2027). Dela...
Removal of ISO joints is dependent on commissioning of new ESTW-A signalling system (planned Oct 2026). Delays in signa...
Submission deadline in 12 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications