Horizontal directional drilling under Guldborgsund and Roskilde Fjord
Original notice title
Installation of pipes with horizontal directional drilling (HDD) under Guldborgsund and Roskilde Fjord - 23/03722
Opportunity Score
Why this score?
Opportunity
65 / 100
Complexity
70 / 100
Risk factors
Lot 1 requires minimum equity of 28M DKK and equity ratio ≥20%; failing to meet these exact thresholds may disqualify.
Requires at least two references of HDD >800 m installing Ø500 PE pipes or larger, plus experience in nature preservati...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- DKK 147M estimated value
- Works contract
- 2 lots
- Horizontal directional drilling (HDD) for installation of PE pipes
- Establishing cable crossings for 145 kV cable systems and fiber connections
Show full summary
This tender by Energinet Eltransmission A/S covers horizontal directional drilling (HDD) for installation of PE pipes under Guldborgsund (Lot 1) and Roskilde Fjord (Lot 2) for new 145 kV cable systems and fiber connections. Total estimated value is 147M DKK. The procedure is a negotiated procedure with a call for competition. Submission is electronic, with languages English and Danish. Deadline for prequalification is 10 July 2026 at 12:00 Danish local time. Award criteria are price (50%) and technical solution (20%).
Risks
Lot 1 requires minimum equity of 28M DKK and equity ratio ≥20%; failing to meet these exact thresholds may disqualify.
Requires at least two references of HDD >800 m installing Ø500 PE pipes or larger, plus experience in nature preservati...
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- ESPD must be completed online
Administrative
- Tenderers may submit for one or both lots
- Electronic submission via Comdia platform
Requirements may be incomplete.
Award Criteria
Lot 1
Lot 2
Buyer
Name
Energinet Eltransmission A/S
Location
Fredericia, DNK
Website
Identifier
39314878
Lots (2)
LOT-0001
Lot 1 - Cable crossings for new 145 kV cable systems and fiber connections across Guldborgsund
Two pipe sets, two power cable systems from Falster to Lolland. Pipe #1 estimated length 1,254 m, Pipe #2 estimated length 1,207 m. Duration 7 months.
Location
Duration
Category
Selection criteria
Deadline
Award details
Show original TED data
Original TED description
Two pipe sets, two power cable systems oPipe #1 from Falster to Lolland. Estimated length 1,254 m oPipe #2 from Falster to Lolland. Estimated length 1,207 m
LOT-0002
Lot 2 - Cable crossings for new 145 kV cable systems and fiber connections across Roskilde Fjord
One pipe set, one power cable system from Roskilde Fjord West to East landings. Estimated length 1,755 m. Duration 6 months.
Location
Duration
Category
Selection criteria
Deadline
Award details
Show original TED data
Original TED description
Roskilde Fjord: One pipe set, one power cable system oPipe #1 from Roskilde Fjord West – East landings. Estimated length 1,755 m Tenders can be submitted for one or all partial agreements
Procurement Details
- Publication date
- 11 Jun 2026
- Notice type
- Contract notice — standard
- Languages
- English, Danish
Reference metadata
- Notice subtype
- 17
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 405713-2026
- Source notice ID
- 16e54f80-aedc-4ec2-9421-bf3e8928ba28
Documents (1)
Similar tenders
Germany – Electrical wiring and fitting work – UKM Marienhospital GmbH - Geb. 9910 Standort Steinfurt - Neubau Bettenhaus 1. und 2. BA | M017-G27 Starkstrom + Nachrichtentechnik
Germany – Electrical wiring and fitting work – Elektroarbeiten KG 440+450 für das Leibniz-Gymnasium Remscheid
Germany – Electrical installation work – ZFB - Neubau eines Zentrums für Feuerwehrwesen und Bevölkerungsschutz
Latvia – Construction work – Objekta “TEN-T ielu pārbūve Jēkabpilī" būvdarbi
Germany – Construction work for university buildings – VE 411 Gebäudeautomation
Poland – Construction work – Zaprojektowanie i wykonanie robót dla zadania pn.: "Prace na linii kolejowej C–E 20 na odcinku Pilawa - Łuków"
Opportunity Score
Why this score?
Opportunity
65 / 100
Complexity
70 / 100
Risk factors
Lot 1 requires minimum equity of 28M DKK and equity ratio ≥20%; failing to meet these exact thresholds may disqualify.
Requires at least two references of HDD >800 m installing Ø500 PE pipes or larger, plus experience in nature preservati...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience