Smart electricity meters and AMI HES for CON 1162
Original notice title
CON 1162 Smart Electricity Meters, Smart AMI HES
Opportunity Score
Why this score?
Opportunity
65 / 100
Complexity
85 / 100
Risk factors
Lot 2 involves complex system integration, security architecture, and interoperability with multiple vendors and legacy...
Requirement to scale from 1.5 million to potentially 3 million meters, imposing performance and scalability risks.
Submission deadline in 7 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- EUR 162M estimated value
- Framework procurement
- Supplies contract
- 2 lots
- Duration 15 YEAR
- Lot 1: Manufacture, supply, and delivery of smart electricity meters (single-phase and three-phase).
- Lot 2: Development, implementation, integration, and support of an AMI Head-End System.
Show full summary
This tender is a prequalification (PQQ) for a multi-vendor framework agreement for smart electricity meters (Lot 1) and an AMI Head-End System (Lot 2) for ESB Networks in Ireland. The framework has an estimated maximum value of €162,000,000, covering up to 1.5 million meters with potential scaling to 3 million. Duration is 6 years with an optional 9-year extension. Submission is electronic via etenders.gov.ie by 1 July 2026.
Risks
Lot 2 involves complex system integration, security architecture, and interoperability with multiple vendors and legacy...
Requirement to scale from 1.5 million to potentially 3 million meters, imposing performance and scalability risks.
Submission deadline in 7 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Administrative
- Submission via prequalification questionnaire (PQQ).
- Electronic submission required via etenders.gov.ie.
- Language: English.
Requirements may be incomplete.
Award Criteria
Lot 1
Lot 2
Buyer
Name
Electricity Supply Board ( ESB )
Location
Dublin, IRL
Website
Buyer profile
Identifier
8F52100V
Lots (2)
LOT-0001
Smart Electricity Meters
Manufacture, supply, and delivery of up to 1,500,000 single-phase and three-phase whole current smart electricity meters, called off incrementally over the framework life.
EUR 0
Estimated value
Location
Duration
Category
Selection criteria
Award details
Value note
Show original TED data
Original TED description
The Contracting Entity intends to procure a multi-vendor framework agreement for the provision of Lot 1: Smart Electricity Meters • Manufacture, supply, and delivery of up to 1,500,000 Single-Phase and Three-Phase Whole current Smart Electricity Meters, to be called off incrementally over the life of the framework as required. Economic Operators who wish to participate in this Prequalification Questionnaire process should submit a response as set out in section A.3 of the attached document. At the date of issuing this PQQ it is envisaged that the duration of the Framework Agreement will be a six (6) year term with the option to extend to an additional nine (9) years to cover ongoing IT and technology support and maintenance services for both Lots.
LOT-0002
Smart Advanced Metering Infrastructure (AMI) Head End System (HES)
Development, implementation, integration, and ongoing support of an AMI Head-End System capable of handling 1.5 million smart meters initially, scaling to 3 million. Includes integration with existing systems (e.g., Siemens MDMS) and mobile network operators.
EUR 0
Estimated value
Location
Duration
Category
Selection criteria
Award details
Value note
Show original TED data
Original TED description
The Contracting Entity intends to procure a multi-vendor framework agreement for the provision of Lot 2: Smart Advanced Metering Infrastructure (AMI) Head-End System (HES). ESB anticipates procuring: Development (inclusive of Security Architecture), development, implementation, and integration of the required IT systems, including but not limited to the following: • A Head End System (HES) capable of integrating with multiple SEM meter vendor’s products concurrently, delivering high levels of interoperability across multiple devices, communications and system vendors within a complex AMI environment. • A Head-End System (HES) capable of meeting ESB Networks’ functional, security, and performance requirement for 1.5 million SEMs initially and the capacity to scale up to potentially 3 million SEMs during the contract term. • The integration and development of an adaptor between the HES and the Siemens Energy IP Meter Data Management System (MDMS). • All associated integrations with existing ESB Networks systems and operational platforms. • Integration with Mobile Network Operator systems • Implementation of the AC Electricity Smart Meter Generic Companion Profile (ACE SM GCP) and local customisations to support the reliable and secure communication between the HES and SEMs across Wide Area Network (WAN) technologies. • System implementation services, including configuration, testing, migration, and commissioning of the proposed IT systems. • Ongoing support, maintenance, and management services to ensure continuity of operations, system performance, and long-term lifecycle management. Economic Operators who wish to participate in this Prequalification Questionnaire process should submit a response as set out in section A.3 of the attached document. At the date of issuing this PQQ it is envisaged that the duration of the Framework Agreement will be a six (6) year term with the option to extend to an additional nine (9) years to cover ongoing IT and technology support and maintenance services for both Lots.
Procurement Details
- Publication date
- 11 Jun 2026
- Notice type
- Contract notice — standard
- Languages
- English
Reference metadata
- Notice subtype
- 17
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 403361-2026
- Source notice ID
- e8f9ac03-b7f2-4e25-9062-e7e1bddce6d7
Documents (2)
Similar tenders
Slovakia – Traffic-flow measuring system – Monitorovací systém dopravy regiónu Vysoké Tatry
Latvia – Checking and testing apparatus – Vispārīgā vienošanās par dažādu inženiersistēmu skaitītāju un to datu eksporta moduļu piegādi, uzstādīšanu un garantijas nodrošināšanu dažādās profesionālajās izglītības iestādēs un koledžās
Greece – Software package and information systems – ΨΗΦΙΑΚΟΣ ΜΕΤΑΣΧΗΜΑΤΙΣΜΟΣ ΔΗΜΟΥ ΠΥΔΝΑΣ - ΚΟΛΙΝΔΡΟΥ
Slovakia – Traffic-flow measuring system – Monitorovací systém dopravy regiónu Vysoké Tatry
France – Electricity meters – Fourniture de compteurs d'électricité Linky® CPL G3
France – Electronic meters – Fourniture de compteurs HTA Saphir
Opportunity Score
Why this score?
Opportunity
65 / 100
Complexity
85 / 100
Risk factors
Lot 2 involves complex system integration, security architecture, and interoperability with multiple vendors and legacy...
Requirement to scale from 1.5 million to potentially 3 million meters, imposing performance and scalability risks.
Submission deadline in 7 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications