Default lot
Original notice title
CONSTRUIRE IMOBIL 2S+P+10E CU DESTINATIA HOTEL SI PARCARI LA SUBSOLURI
Opportunity Score
Why this score?
Opportunity
68 / 100
Complexity
65 / 100
Risk factors
No procurement documents (technical specs, draft contract) were analyzed. Essential details missing such as payment ter...
Submission deadline is approximately 38 days from publication (June 8 to July 14). If complex clarifications are needed...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- RON 31.1M estimated value
- Works contract
- 1 lot
- Duration 12 MONTH
- Construction of a hotel building (2S+P+10E) with reinforced concrete structure
- Underground parking for 61 vehicles
Show full summary
Private tender for construction of a hotel (2S+P+10E) with underground parking in Craiova, Romania. Single lot, estimated value 31,078,977.13 RON, open procedure, electronic submission via SEAP. Procurement documents were not analyzed beyond the notice.
Risks
No procurement documents (technical specs, draft contract) were analyzed. Essential details missing such as payment ter...
Submission deadline is approximately 38 days from publication (June 8 to July 14). If complex clarifications are needed...
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Compliance with Romanian fire safety regulations (OMAI 180/2022, HGR 571/2016)
- Construction duration: 12 months
- All works must be executed according to PT (Technical Project) phase
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
SC SENTIFOX SRL
Location
Craiova, ROU
Website
Buyer profile
Identifier
RO33568024
Lots (1)
LOT-0000
Default lot
Construction of a hotel and parking as per PT phase: reinforced concrete structure, 2 basements, ground floor, 10 floors, including safety shelter, restaurant, conference room, 8 rooms per floor, spa, technical spaces. Duration 12 months. Includes all construction, installation, and assembly works.
RON 31.1M
Estimated value
Location
Duration
Category
Selection criteria
Deadline
Award details
Additional CPV codes
Value note
Show original TED data
Original TED description
Avand in vedere documentatia intocmita la faza PT cuprinde următoarele categorii de cheltuieli: cap.2 realizarea utilitatilor necesare obiectivului – 29931,27 lei cap 4.1 constructii si instalatii – 29955750,31 lei cap.4.2 montaj utilaje, echipamente tehnologice si functionale - 6280.56 lei cap.4.3 utilaje, echipamente tehnologice si functionale care necesita montaj – 1072014,99 lei cap.5.1 organizare de santier 15000.00 lei Valoarea estimată a prezentei achiziții de lucrari este de 31078977,13 lei fara TVA
Procurement Details
- Publication date
- 07 Jun 2026
- Notice type
- Contract notice — standard
- Languages
- Romanian
Reference metadata
- Notice subtype
- 16
- Notice version
- 1
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 389931-2026
- Source notice ID
- 72fe8eac-7048-495d-8d72-ab89368e2d17
Documents (2)
Similar tenders
Germany – Building construction work – Erweiterung des Wasserwerkes Haren
France – Construction work – Collonges-sous-Salève, Rte des Manessières - "Domaine Hemera" - Consultation de marchés travaux pour la construction d'un ensemble de 54 logements collectifs et 54 garages en sous-sols.
Ireland – Construction work – St. Brigids B.N.S. Killester New Special Education Needs Unit Works Contractor
Germany – Building construction work – Sanierung Rathaus Heidenheim - Ausstattung Medientechnik
France – Electrical installation work – ACCORD CADRE A BONS DE COMMANDE - LOT ELECTRICITE - REMISE EN ETAT DE LOGEMENTS ET PARTIES COMMUNES DU PATRIMOINE DE SEMINOR.
Hungary – Building construction work – Tudományos és Innovációs Parkok megvalósítása
Opportunity Score
Why this score?
Opportunity
68 / 100
Complexity
65 / 100
Risk factors
No procurement documents (technical specs, draft contract) were analyzed. Essential details missing such as payment ter...
Submission deadline is approximately 38 days from publication (June 8 to July 14). If complex clarifications are needed...