BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
70 / 100
Risk factors
No procurement documents analyzed – key terms, technical specifications, and conditions unknown.
Strict experience requirements may disqualify tenderers without specific references (e.g., waterproof concrete, deep sh...
No procurement documents available
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- NOK 95M estimated value
- Supplies contract
- 1 lot
- Duration 46 MONTH
- Establishment of a raw water pump station
- Execution of pipelines from ENT2 up to the land pipeline contract (ENT3)
Show full summary
Gjøvik municipality seeks a supplier for the establishment of a raw water pump station and pipelines as part of a back-up water system (Stage 2). The contract covers works from ENT2 to the land pipeline contract (ENT3). The tender is a negotiated procedure with call for competition, valued at 95,000,000 NOK. Only one lot is identified. Tender documents are available via Artifik but were not analyzed.
Risks
No procurement documents analyzed – key terms, technical specifications, and conditions unknown.
Strict experience requirements may disqualify tenderers without specific references (e.g., waterproof concrete, deep sh...
No procurement documents available
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Tenderers must be a legally established company
- Sufficient financial capacity (annual accounts for 2024-2025, credit rating)
- Relevant experience: waterproof concrete constructions, deep sheet pits, pressurized stainless steel pipes Ø500+, pump delivery/installation, steel pipes PN16, welded steel...
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
Gjøvik Kommune
Location
Gjøvik, NOR
Website
Buyer profile
Identifier
940155223
Lots (1)
LOT-0001
BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Establishment of a raw water pump station and pipelines from ENT2 to the land pipeline contract (ENT3) as part of Stage 2 of the Gjøvik-Biri back-up water system.
Location
Duration
Category
Selection criteria
Deadline
Award details
Additional CPV codes
Show original TED data
Original TED description
Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.
Procurement Details
- Publication date
- 02 Jun 2026
- Notice type
- Contract notice — standard
- Languages
- English, Norwegian
Reference metadata
- Notice subtype
- 17
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 382098-2026
- Source notice ID
- 6afd6de1-85e2-4846-8a58-3d1d02665c8f
Documents (1)
Similar tenders
Austria – Construction work for water projects – Revitalisierung der Dornbirner Ache
Italy – Construction work for water and sewage pipelines – GARA mediante procedura aperta, ai sensi dell’art. 71 del D. Lgs. n. 36/2023 e s.m.i., espletata in modalità telematica, per l’affidamento dei lavori di “Rifacimento del collettore fognario in Via Santa Caterina da Siena” - Comune di Giugliano in Campania (NA).
Poland – Pipeline, piping, pipes, casing, tubing and related items – Dostawa łuków na potrzeby realizacji zadania „Budowa gazociągu DN 700 do Elektrowni Kozienice wraz ze stacją gazową oraz infrastrukturą towarzyszącą”
Slovakia – Flatwork for children's play area – Zelené sídliská / lokalita MAGURSKÁ-KRIVÁNSKA-JELŠOVÝ HÁJIK, 1.etapa
Norway – Cycle path construction work – Torbjørn Bratts veg, cycle path and pavement
Poland – River regulation and flood control works – Eliminacja zagrożeń środowiskowych i poprawa wizerunku rzeki Radomki – etap I
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
70 / 100
Risk factors
No procurement documents analyzed – key terms, technical specifications, and conditions unknown.
Strict experience requirements may disqualify tenderers without specific references (e.g., waterproof concrete, deep sh...
No procurement documents available
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications