Budowa bateryjnego systemu magazynowania energii elektrycznej BESS Stare Bogaczowice II wraz z infrastrukturą towarzyszącą
Opportunity Score
Why this score?
Opportunity
55 / 100
Complexity
65 / 100
Risk factors
No contract value disclosed; high bid bond may be disproportionate if total value is lower than expected.
Eligibility and documentation requirements are not specified in the notice, only referenced to procurement documents. T...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 1 lot
- Duration until Oct 2028
- Construction of a Battery Energy Storage System (BESS) of approximately 20-50 MW capacity (estimated based on similar projects, but not specified in data)
- All ancillary infrastructure including electrical connections, site preparation, cabling, and civil works
Show full summary
This is an open works tender by TAURON BME7 sp. z o.o. for the construction of a Battery Energy Storage System (BESS) in Stare Bogaczowice, Poland. The notice indicates a single lot covering design, delivery, and construction of the BESS with associated infrastructure. The estimated value is not provided. The deadline for submissions is 2026-07-10 at 11:00 UTC. Award criteria are price (80%) and quality (20%), including warranty, technical parameters, and origin of components. A bid bond of 3,500,000 PLN is required. No selection criteria or required documents beyond the bond are specified in the available data.
Risks
No contract value disclosed; high bid bond may be disproportionate if total value is lower than expected.
Eligibility and documentation requirements are not specified in the notice, only referenced to procurement documents. T...
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Bid bond (wadium) of 3,500,000 PLN required
Administrative
- Electronic submission via platform Open portal
- Submission language: Polish only
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
TAURON BME7 sp. z o.o.
Location
Katowice, POL
Website
Buyer profile
Identifier
NIP 6343042679
Lots (1)
LOT-0001
Budowa bateryjnego systemu magazynowania energii elektrycznej BESS Stare Bogaczowice II wraz z infrastrukturą towarzyszącą
Construction of a battery energy storage system with ancillary infrastructure at Mokrzeszów, Poland. Includes electrical works, civil works, cabling, and related services.
Location
Duration
Category
Selection criteria
Deadline
Award details
Additional CPV codes
Show original TED data
Original TED description
Przedmiotem zamówienia jest budowa bateryjnego systemu magazynowania energii elektrycznej BESS Stare Bogaczowice II wraz z infrastrukturą towarzyszącą
Procurement Details
- Publication date
- 01 Jun 2026
- Notice type
- Contract notice — standard
- Languages
- Polish
Reference metadata
- Notice subtype
- 17
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 377458-2026
- Source notice ID
- a30784e3-d459-4f7d-b33d-bd8688eaffb5
Documents (2)
Similar tenders
Germany – Building construction work – Erweiterung des Wasserwerkes Haren
Poland – Construction work – „RESA – rozwój ekonomicznej strefy awiacji: komponent FLIGHT ECO CENTER”
France – Construction work – Collonges-sous-Salève, Rte des Manessières - "Domaine Hemera" - Consultation de marchés travaux pour la construction d'un ensemble de 54 logements collectifs et 54 garages en sous-sols.
Ireland – Construction work – St. Brigids B.N.S. Killester New Special Education Needs Unit Works Contractor
Germany – Building construction work – Sanierung Rathaus Heidenheim - Ausstattung Medientechnik
France – Electrical installation work – ACCORD CADRE A BONS DE COMMANDE - LOT ELECTRICITE - REMISE EN ETAT DE LOGEMENTS ET PARTIES COMMUNES DU PATRIMOINE DE SEMINOR.
Opportunity Score
Why this score?
Opportunity
55 / 100
Complexity
65 / 100
Risk factors
No contract value disclosed; high bid bond may be disproportionate if total value is lower than expected.
Eligibility and documentation requirements are not specified in the notice, only referenced to procurement documents. T...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications