Pełnienie nadzoru inwestorskiego nad zadaniem: „Zaprojektowanie i wykonanie robót budowlanych w ramach zadania pn.: „Prace na linii kolejowej nr 179 na odcinku Tychy – Bieruń Stary” realizowanego w ramach Programu Fundusze Europejskie na Infrastrukturę, Klimat, Środowisko 2021-2027”

PKP Polskie Linie Kolejowe S.A.·Warszawa, Poland·Deadline Jul 07, 2026 · 13 days left·Open·Services
Structured notice only
55/100

Opportunity Score

Needs reviewHigh complexity
ServicesOpen
Why this score?

Opportunity

55 / 100

Complexity

75 / 100

Risk factors

Requirement for 2 railway supervision contracts with construction value ≥150M PLN each severely limits eligible bidders.

Need to demonstrate credit line or funds of at least 1,022,440 PLN; may require bank confirmation.

Submission deadline in 13 days

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Services contract
  • 1 lot
  • Duration 39 MONTH
  • Engineer role per construction contract(s)
  • Financial and substantive management, including billing, monitoring, and reporting
Show full summary

Open tender by PKP Polskie Linie Kolejowe S.A. for investor supervision services on railway line No. 179, section Tychy – Bieruń Stary, Poland. The contract includes design and construction supervision, financial management, and environmental oversight. EU-funded under the Infrastructure, Climate, Environment Programme 2021-2027. Single lot, 39-month duration (including a 12-month option). Strict experience and financial requirements. Estimated value not disclosed.

Risks

Requirement for 2 railway supervision contracts with construction value ≥150M PLN each severely limits eligible bidders.

Need to demonstrate credit line or funds of at least 1,022,440 PLN; may require bank confirmation.

Submission deadline in 13 days

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Must have performed at least 2 similar supervision services for railway construction/upgrade projects, each with a construction value of at least 150,000,000 PLN gross
  • Must demonstrate financial capacity: minimum available funds or credit line of 1,022,440 PLN
  • Must provide key personnel with specific qualifications: Project Engineer with 5 years experience, relevant building permits, etc.

Requirements may be incomplete.

Award Criteria

Lot 1

W kryterium tym będzie oceniania Cena, przez którą należy rozumieć całkowite Wynagrodzenie brutto Wykonawcy z tytułu realizacji umowy. Całkowita cena brutto – waga:76%

Buyer

Name

PKP Polskie Linie Kolejowe S.A.

Location

Warszawa, POL

Buyer profile

Open profile

Identifier

1132316427

Lots (1)

LOT-0001

Pełnienie nadzoru inwestorskiego nad zadaniem: „Zaprojektowanie i wykonanie robót budowlanych w ramach zadania pn.: „Prace na linii kolejowej nr 179 na odcinku Tychy – Bieruń Stary” realizowanego w ramach Programu Fundusze Europejskie na Infrastrukturę, Klimat, Środowisko 2021-2027”

Investor supervision for the design and construction of railway line No. 179, Tychy – Bieruń Stary. Services include engineer role, financial management, technical supervision, coordination of construction contracts, and environmental/nature supervision. Includes a term option (up to 12 months extension).

ServicesEU fundedElectronic submission

Location

Tychy - Bieruń, Poland

Duration

39 MONTH

Category

Construction supervision services

Selection criteria

Price

Deadline

Deadline Jul 07, 2026

Procurement Details

Publication date
01 Jun 2026
Notice type
Contract notice — standard
Languages
Polish

Reference metadata

Notice subtype
17
Notice version
1
Legal basis
32014L0025

Reference IDs

Tender ID
375856-2026
Source notice ID
55d9b052-02ca-424e-a5fc-8a6dd073f335

Documents (1)

Similar tenders

France – Engineering design services for the construction of civil engineering works – Accord-cadre de Maîtrise d’œuvre pour les opérations d’entretien, de réparation et de réhabilitation des ouvrages d’art gérés par la DiRIF

FRASep 4

Poland – Supervision of project and documentation – PEŁNIENIE NADZORU AUTORSKIEGO NAD REALIZACJĄ ZADANIA: REALIZACJA ROBÓT BUDOWLANYCH ORAZ WYKONANIE PROJEKTU WYKONAWCZEGO I REALIZACJA ROBÓT BUDOWLANYCH NA ZABUDOWĘ URZĄDZEŃ STEROWANIA RUCHEM KOLEJOWYM, URZĄDZEŃ KOLEJOWYCH SIECI TELEKOMUNIKACYJNYCH WRAZ ZE ŚWIADCZENIEM USŁUG POGWARANCYJNYCH DLA TYCH URZĄDZEŃ NA ODCINKU ZABRZEG – ZEBRZYDOWICE – GRANICA PAŃSTWA

POLJul 27

Poland – Supervision of building work – Świadczenie usługi budowlanego nadzoru inwestorskiego, nadzoru przyrodniczego i zarządzania realizacją inwestycji pn.:„Budowa gazociągu DN700, MOP 8,4 MPa do Elektrowni Kozienice wraz ze stacją gazową oraz infrastrukturą towarzyszącą”

POLJul 28

France – Flood-control valves – 43 MOULAS - Installation vanne clapet

FRAJul 22

Poland – Engineering design services for the construction of civil engineering works – Opracowanie dokumentacji projektowych dla Zadania 1: Dąbrowa Górnicza Ząbkowice – Będzin – dokumentacja projektowa oraz Zadania 2: Zawiercie - Dąbrowa Górnicza Ząbkowice – dokumentacja projektowa w ramach Projektu: „Prace na linii kolejowej nr 1 na odcinku Zawiercie - Będzin - dokumentacja projektowa Zadanie 1: Dąbrowa Górnicza Ząbkowice – Będzin, Zadanie 2: Zawiercie - Dąbrowa Górnicza Ząbkowice"

POLJun 26

Poland – Architectural, construction, engineering and inspection services – Nadzór inwestorski nad zadaniem Przebudowa i rozbudowa hali lodowej wraz z budową parkingów, pylonu, masztów flagowych, zagospodarowaniem terenu oraz infrastrukturą towarzyszącą - Etap I w ramach zadania „Przebudowa i rozbudowa Hali lodowej przy ul. Chemików 4 w Oświęcimiu”

POLJun 26