Suministro de energía eléctrica a los edificios, instalaciones y servicios públicos titularidad del Ayuntamiento de Campillo de Altobuey
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
20 / 100
Risk factors
Requirement that at least 50% of electricity comes from renewable sources or high-efficiency cogeneration; failure to m...
Important procurement documents (e.g., technical specifications, contract terms) were not analyzed; only the notice is...
Submission deadline in 9 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Strong opportunityKey Facts
- EUR 227.5k estimated value
- Supplies contract
- 1 lot
- Duration 1 YEAR
- Supply of electricity to municipal buildings and public services in Campillo de Altobuey
- At least 50% of electricity must come from renewable sources or high-efficiency cogeneration
Show full summary
This tender is for the supply of electricity to public buildings and services in Campillo de Altobuey, Spain. It is a single-lot, open procedure with an estimated value of €227,485.94. The contract has a duration of 1 year, renewable for an additional year. Award criteria are weighted 70% price and 30% quality (future price closure, guarantee of origin, telemetry). Bidders must ensure at least 50% of electricity comes from renewable or high-efficiency cogeneration sources. Electronic submission in Spanish is required.
Risks
Requirement that at least 50% of electricity comes from renewable sources or high-efficiency cogeneration; failure to m...
Important procurement documents (e.g., technical specifications, contract terms) were not analyzed; only the notice is...
Submission deadline in 9 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- At least 50% of supplied electricity must be from renewable or high-efficiency cogeneration sources
Administrative
- Electronic submission required
- Submission language: Spanish
Award Criteria
Lot 1
Buyer
Name
Pleno del Ayuntamiento de Campillo de Altobuey
Location
Campillo de Altobuey, ESP
Buyer profile
Identifier
31106200154380
Lots (1)
LOT-0000
Suministro de energía eléctrica a los edificios, instalaciones y servicios públicos titularidad del Ayuntamiento de Campillo de Altobuey
Electricity supply for the municipality's public buildings and services as per technical specifications.
EUR 227.5k
Estimated value
Location
Duration
Category
Selection criteria
Deadline
Award details
Value note
Show original TED data
Original TED description
Suministro de energía eléctrica a los edificios, instalaciones y servicios públicos titularidad del Ayuntamiento de Ayuntamiento de Campillo de Altobuey según el Pliego Técnico
Procurement Details
- Publication date
- 31 May 2026
- Notice type
- Contract notice — standard
- Languages
- Spanish
Reference metadata
- Notice subtype
- 16
- Notice version
- 1
- Legal basis
- 32014L0024
Reference IDs
- Tender ID
- 373212-2026
- Source notice ID
- 544d66cc-9f3c-40fc-a3de-8c5bdc45f6b3
Documents (1)
Similar tenders
Germany – Petroleum products, fuel, electricity and other sources of energy – Energiedienste der Landeshauptstadt Stuttgart GmbH - Europaweite Vergabe von Rahmenvereinbarungen über die Beschaffung von Gas und Strom in vier Losen
Poland – Electricity – Kompleksowa dostawa energii elektrycznej w 2027 i 2028 roku, polegająca na sprzedaży i świadczeniu usługi dystrybucji energii elektrycznej dla obiektów Gminy Boguchwała
Netherlands – Electricity – Europese aanbesteding volgens de openbare procedure voor levering van elektriciteit en GVO’s
France – Natural gas – Fourniture d'énergie : Electricité / Gaz naturel
France – Electricity – ACCORD CADRE POUR LA FOURNITURE ET L'ACHEMINEMENT D'ELECTRICITE ET SERVICES ASSOCIES (2027-2031).
Bulgaria – Electricity – Избор на доставчик на електрическа енергия и координатор на балансираща група за обекти, собственост на община Симитли и второстепенни разпоредители, присъединени към електроразпределителната мрежа на ниво средно и ниско напрежение
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
20 / 100
Risk factors
Requirement that at least 50% of electricity comes from renewable sources or high-efficiency cogeneration; failure to m...
Important procurement documents (e.g., technical specifications, contract terms) were not analyzed; only the notice is...
Submission deadline in 9 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications