Budowa nowych jednostek wytwórczych wraz z akumulatorem ciepła w EC Zawidawie

Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.·Wrocław, Poland·Deadline Jun 30, 2026 · 6 days left·Open·Works
Structured notice only
50/100

Opportunity Score

Needs reviewHigh complexity
WorksOpen
Why this score?

Opportunity

50 / 100

Complexity

80 / 100

Risk factors

No estimated value disclosed; the contract could be substantial but also subject to funding availability. The project m...

Complex integration with existing systems (cogeneration units AK1-3) and different electrical connection capacities fro...

Submission deadline in 6 days

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • Works contract
  • 1 lot
  • Design, supply, construction, integration, commissioning, and handover of an electric boiler house with total thermal power ≥10 MWt and efficiency ≥97%
  • Design and construction of a steel cylindrical heat accumulator with net usable volume ≥2,000 m³
Show full summary

Open tender by Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A. for turnkey construction of new generation units with a heat accumulator at EC Zawidawie in Wrocław, Poland. The scope includes an electric boiler house (≥10 MWt, ≥97% efficiency), a steel heat accumulator (≥2,000 m³ net), cogeneration unit AK4 (4.5 MWe, supply excluded), fire water tank, and reconnection of existing units. Single lot, price-only award (100%). No estimated value provided. Deadline for tenders: 2026-06-30 10:00 UTC. Electronic submission required via PGE procurement system. Documents include confidential appendices requiring a signed confidentiality undertaking.

Risks

No estimated value disclosed; the contract could be substantial but also subject to funding availability. The project m...

Complex integration with existing systems (cogeneration units AK1-3) and different electrical connection capacities fro...

Submission deadline in 6 days

No procurement documents available

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Turnkey delivery ('pod klucz') covering entire project from design to handover
  • Electric boilers must achieve at least 97% efficiency
  • Heat accumulator must have net usable volume at least 2,000 m³

Requirements may be incomplete.

Award Criteria

Lot 1

Cena. Waga KryteriumSzczegóły dotyczące kryteriów oceny ofert zawarto w pkt. 24 SWZ100%

Buyer

Name

Zespół Elektrociepłowni Wrocławskich KOGENERACJA S.A.

Location

Wrocław, POL

Identifier

NIP: 8960000032

Lots (1)

LOT-0000

Budowa nowych jednostek wytwórczych wraz z akumulatorem ciepła w EC Zawidawie

Turnkey design, supply, construction, commissioning of electric boiler house (≥10 MWt, ≥97% efficiency), steel heat accumulator (≥2,000 m³), cogeneration unit AK4 (4.5 MWe, supply excluded), fire water tank, and reconnection of existing units AK1-3. Includes integration with existing system and related BoP infrastructure.

WorksElectronic submission

Location

Poland

Category

Construction works for power plants

Deadline

Deadline Jun 30, 2026

Procurement Details

Publication date
17 May 2026
Notice type
Contract notice — standard
Languages
Polish

Reference metadata

Notice subtype
17
Notice version
1
Legal basis
32014L0025

Reference IDs

Tender ID
337843-2026
Source notice ID
8d495c8a-604f-4c9c-8d8d-09dff6682028