Accord-Cadre pour les travaux préliminaires à la Centrale EDF SEI de Saint Barthélémy.
Opportunity Score
Why this score?
Opportunity
55 / 100
Complexity
65 / 100
Risk factors
Short submission period (approx. 26 days) may limit the number of bidders and put pressure on preparation.
Strict turnover and certification requirements may disqualify many bidders.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- EUR 10M estimated value
- Framework procurement
- Works contract
- 1 lot
- Divert lines and piping necessary for operating the second tranche of the power plant
- Supply temporary power plant to manage supply-demand balance during construction
Show full summary
This notice is a framework agreement for preliminary works at the EDF SEI power plant in Saint Barthélémy, France. It involves diverting lines and piping, constructing a building, and performing mechanical/electrical works. The framework is for 3 years with a maximum value of €10,000,000. The procedure is a negotiated competition with preselection. Submission is electronic via EDF's procurement portal, and all documents must be in French.
Risks
Short submission period (approx. 26 days) may limit the number of bidders and put pressure on preparation.
Strict turnover and certification requirements may disqualify many bidders.
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Consortia allowed but must designate a joint and several representative
Administrative
- Electronic submission mandatory via EDF procurement portal Open portal
- All documents must be in French
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
EDF SA
Location
Paris, FRA
Website
Buyer profile
Identifier
552 081 317
Lots (1)
LOT-0001
Accord-Cadre pour les travaux préliminaires à la Centrale EDF SEI de Saint Barthélémy.
Single lot covering all works: diversion of lines and piping, construction of a workshop/warehouse/office building, and mechanical/electrical installations, all under decree 92.
EUR 10M
Estimated value
Location
Category
Deadline
Award details
Value note
Framework maximum value
Show original TED data
Original TED description
Accord cadre d'une durée de 3 ans qui a pour objectif de dévoyer les lignes et tuyauteries nécessaires à l’exploitation de la tranche 2 dans les meilleures conditions de sécurité et d’exploitabilité possible et à l'alimentation de la centrale temporaire de façon à maitriser l’Equilibre Offre Demande durant le chantier, de construire un bâtiment (atelier, magasin et tertiaire), et des ouvrages mécaniques et électriques, le tout sous décret 92.
Procurement Details
- Publication date
- 06 May 2026
- Notice type
- Contract notice — standard
- Languages
- French
Reference metadata
- Notice subtype
- 17
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 312120-2026
- Source notice ID
- a101f74b-5091-4e1b-bfb9-a69e5d063d6a
Documents (1)
Similar tenders
Poland – Construction work – „RESA – rozwój ekonomicznej strefy awiacji: komponent FLIGHT ECO CENTER”
Germany – Site preparation work – Baufeldfreimachung -ID26098_Kor-
Poland – Construction work – Zaprojektowanie i wykonanie robót dla zadania pn.: "Prace na linii kolejowej C–E 20 na odcinku Pilawa - Łuków"
Poland – Construction work – Zaprojektowanie i wybudowanie linii kolejowej dużych prędkości od Węzła CPK (bez Węzła CPK) do Węzła Bolimowskiego (bez Węzła Bolimowskiego)
Norway – Construction work – C06443 - Frigården - Storage of materials - Turnkey contract
France – Site preparation work – Réfection et consolidation des planchers du 1er étage et rdc du Pavillon Hardy de l'ENSP (Versailles)
Opportunity Score
Why this score?
Opportunity
55 / 100
Complexity
65 / 100
Risk factors
Short submission period (approx. 26 days) may limit the number of bidders and put pressure on preparation.
Strict turnover and certification requirements may disqualify many bidders.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications