Award tenders
Awarded contractOpenWorksSpain

Redacción de proyecto constructivo y ejecución de las obras de instalación de bloqueo automático en vía única (BAU) con CTC en el tramo Valchillón-Torres Cabrera-Fuente Piedra

1 supplier awarded1 lot awarded€54.42M awarded

Buyer: Administrador de Infraestructuras Ferroviarias / Madrid, Spain

Published Jul 05, 2026Awarded Jun 30, 2026
Railway signalling worksProject and design preparation, estimation of costs

Awarded value

€54.42M

Estimated value

€60.43M

Awarded at 90% of estimated value

Award date

Jun 30, 2026

Winners

1

Lots awarded

1

Winners

€54.4M This contract

1 award notice1 awarded lot€54.42M total

Lots awarded

LotTitleWinnerAward valueMain CPV
LOT-0001
UTE ALSTOM INTEL VALCHILLÓN (constituida por ALSTOM TRANSPORTE, S.A.U. e INSTALACIONES Y TÉCNICAS ELÉCTRICAS ASTURIANAS, S.A.)€54.4M

Railway signalling works (45234115), Project and design preparation, estimation of costs (71242000)