Awarded contractOpenWorksPoland
Budowa drogi S10 Szczecin – Piła; odcinek 7, węzeł „Piecnik” (z węzłem) – węzeł „Wałcz Zachód” (bez węzła)
1 supplier awarded•1 lot awarded•€128.88M awarded
Buyer: Generalna Dyrekcja Dróg Krajowych i Autostrad / Szczecin, Poland
Published May 28, 2024Awarded Mar 12, 2024
Road construction worksSite preparation workEngineering works and construction works+13
Awarded value
€128.88M
Estimated value
€128.88M
Awarded at 100% of estimated value
Award date
Mar 12, 2024
Winners
1
Lots awarded
1
Winners
Lots awarded
| Lot | Title | Winner | Award value | Main CPV |
|---|---|---|---|---|
| LOT-0000 | BUDIMEX S.A | €128.9M | Road construction works (45233120), Site preparation work (45100000) |