Awarded contractOpenWorksBelgium
TR142349: La suppression du passage à niveau 119 le long de la ligne ferroviaire 35. La construction d’un pont pour cyclistes le long des voies sur la Langestraat.
1 supplier awarded•1 lot awarded•€11.44M awarded
Buyer: Infrabel sa / Sint-Gillis, Belgium
Published Jan 15, 2024
Construction work for bridges and tunnels, shafts and subwaysEngineering works and construction worksSoil-stripping work
Awarded value
€11.44M
Estimated value
Not specified
Award date
—
Winners
1
Lots awarded
1
Winners
6a4adff2ac2d3d0afd9934f5
1 lotGansbroekstraat 70 2870 PUURS-SINT-AMANDS, BEL
€11.4M This contract
2 award notices•2 awarded lots•€18.86M total
Lots awarded
| Lot | Title | Winner | Award value | Main CPV |
|---|---|---|---|---|
| LOT-0001 | 6a4adff2ac2d3d0afd9934f5 | €11.4M | Engineering works and construction works (45220000), Soil-stripping work (45112200) |