Dostawa materiałów do wykonania tramwajowej sieci trakcyjnej i materiałów kolejowych (5 części)
1 supplier awarded•5 lots awarded•€748,220 awarded
Buyer: Tramwaje Warszawskie sp. z o.o. / Warszawa, Poland
Awarded value
€748.2K
Estimated value
€850.6K
Awarded at 88% of estimated value
Award date
Mar 28, 2024
Winners
1
Lots awarded
5
Award values
Notice total
€748.2K
Sum of lot awards
€695.8K
TED notice total and lot-level values do not exactly match.
Winners
€451,744 This contract
1 award notice•4 awarded lots•€451,744 total
Lots awarded
| Lot | Title | Winner | Award value | Main CPV |
|---|---|---|---|---|
| LOT-0002 | Przedsiębiorstwo Produkcyjno-Handlowe „BAKPOL” ADAM BĄK | €244,074 | Parts of electricity distribution or control apparatus (31230000), Railway-track construction materials and supplies (34946000) | |
| LOT-0003 | Not specified | €244,074 | Electrical supplies and accessories (31680000), Parts of electricity distribution or control apparatus (31230000) | |
| LOT-0005 | Przedsiębiorstwo Produkcyjno-Handlowe „BAKPOL” ADAM BĄK | €79,019 | Railway-track construction materials and supplies (34946000) | |
| LOT-0001 | Przedsiębiorstwo Produkcyjno-Handlowe „BAKPOL” ADAM BĄK | €73,117 | Electrical supplies and accessories (31680000), Parts of electricity distribution or control apparatus (31230000) | |
| LOT-0004 | Przedsiębiorstwo Produkcyjno-Handlowe „BAKPOL” ADAM BĄK | €55,534 | Electrical supplies and accessories (31680000), Railway-track construction materials and supplies (34946000) |