Awarded contractFrameworkComp TendWorksRomania
Proiectare si executie a lucrarilor de modernizare bransamente prin montare FDCP / BMP in instalatiile DEO din zona de activitate aferente judetului Olt pentru o perioada de 36 luni
1 supplier awarded•1 lot awarded•€4.75M awarded
Buyer: DISTRIBUTIE ENERGIE OLTENIA S.A. / Craiova, Romania
Published Jan 11, 2024
Construction work for electricity power linesElectrical power systems design services
Awarded value
€4.75M
Estimated value
€4.75M
Awarded at 100% of estimated value
Award date
—
Winners
1
Lots awarded
1
Winners
ADREM ENGINEERING SRL
1 lotBucuresti, ROU
Not specified This contract
8 award notices•8 awarded lots•€19.94M total
Lots awarded
| Lot | Title | Winner | Award value | Main CPV |
|---|---|---|---|---|
| LOT-0000 | Framework | ADREM ENGINEERING SRL | — | Construction work for electricity power lines (45231400), Electrical power systems design services (71323100) |