Awarded contractOpenWorksFrance
Construction et installation d'une école provisoire WALLON / LANGEVIN en bâtiment modulaire en bois à VILLIERS-LE-BEL
1 lot awarded•€2.64M awarded
Buyer: COMMUNE DE VILLIERS LE BEL / VILLIERS-LE-BEL, France
Published Mar 14, 2024Awarded Dec 17, 2023
Assembly and erection of prefabricated structures
Awarded value
€2.64M
Estimated value
€2.64M
Awarded at 100% of estimated value
Award date
Dec 17, 2023
Winners
0
Lots awarded
1
Winners
No winners specified.
Lots awarded
| Lot | Title | Winner | Award value | Main CPV |
|---|---|---|---|---|
| LOT-0001 | Not specified | €2.6M | Assembly and erection of prefabricated structures (45223800) |