Awarded contractNeg Wo CallServicesSpain
CONSULTORÍA Y ASISTENCIA TÉCNICA PARA EL CONTROL Y SEGUIMIENTO DE LA FINALIZACIÓN DE LAS OBRAS DE EJECUCIÓN DEL PROYECTO DE CONSTRUCCIÓN DE PLATAFORMA DE LA LINEA DE A.V. VITORIA-SAN SEBASTIÁN. TRAMO: ATXONDO – ABADIÑO
1 supplier awarded•1 lot awarded•€1.17M awarded
Buyer: ADIF Alta Velocidad / Madrid, Spain
Published Feb 21, 2024Awarded Jan 11, 2024
Technical services
Awarded value
€1.17M
Estimated value
€1.19M
Awarded at 99% of estimated value
Award date
Jan 11, 2024
Winners
1
Lots awarded
1
Winners
1 lot
€1.2M This contract
3 award notices•3 awarded lots•€3.26M total
Lots awarded
| Lot | Title | Winner | Award value | Main CPV |
|---|---|---|---|---|
| LOT-0001 | TPF-TYLIN UTE GSM-3 (constituida por TPF GETINSA EUROESTUDIOS S.L. y TYLIN GPO S.L.U.) | €1.2M | Technical services (71356000) |