Tenderwize
Zurück zur Suche

Ireland – Electricity meters – CON 1162 Smart Electricity Meters, Smart AMI HES

Electricity Supply Board ( ESB )·Dublin, Ireland·EUR 162M·Deadline Jul 01, 2026 · 7 days left·Neg W Call·Supplies·Framework
High valueStructured notice only
Original notice title

CON 1162 Smart Electricity Meters, Smart AMI HES

65/100

Opportunity Score

Needs reviewHigh complexity
SuppliesFrameworkOpen
Why this score?

Opportunity

65 / 100

Complexity

85 / 100

Risk factors

Lot 2 involves complex system integration, security architecture, and interoperability with multiple vendors and legacy...

Requirement to scale from 1.5 million to potentially 3 million meters, imposing performance and scalability risks.

Submission deadline in 7 days

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • EUR 162M estimated value
  • Framework procurement
  • Supplies contract
  • 2 lots
  • Lot 1: Manufacture, supply, and delivery of smart electricity meters (single-phase and three-phase).
  • Lot 2: Development, implementation, integration, and support of an AMI Head-End System.
Show full summary

This tender is a prequalification (PQQ) for a multi-vendor framework agreement for smart electricity meters (Lot 1) and an AMI Head-End System (Lot 2) for ESB Networks in Ireland. The framework has an estimated maximum value of €162,000,000, covering up to 1.5 million meters with potential scaling to 3 million. Duration is 6 years with an optional 9-year extension. Submission is electronic via etenders.gov.ie by 1 July 2026.

Risks

Lot 2 involves complex system integration, security architecture, and interoperability with multiple vendors and legacy...

Requirement to scale from 1.5 million to potentially 3 million meters, imposing performance and scalability risks.

Submission deadline in 7 days

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Administrative

  • Submission via prequalification questionnaire (PQQ).
  • Electronic submission required via etenders.gov.ie.
  • Language: English.

Requirements may be incomplete.

Award Criteria

Lot 1

See PQQ Document

Lot 2

Cost criterion

Buyer

Name

Electricity Supply Board ( ESB )

Location

Dublin, IRL

Website

www.esb.ie

Buyer profile

Open profile

Identifier

8F52100V

Lots (2)

LOT-0001

Smart Electricity Meters

Manufacture, supply, and delivery of up to 1,500,000 single-phase and three-phase whole current smart electricity meters, called off incrementally over the framework life.

SuppliesFrameworkElectronic submission

Location

Ireland

Category

Electricity meters

LOT-0002

Smart Advanced Metering Infrastructure (AMI) Head End System (HES)

Development, implementation, integration, and ongoing support of an AMI Head-End System capable of handling 1.5 million smart meters initially, scaling to 3 million. Includes integration with existing systems (e.g., Siemens MDMS) and mobile network operators.

SuppliesFrameworkElectronic submission

Location

Ireland

Category

Electricity meters

Procurement Details

Publication date
11 Jun 2026
Notice type
Contract notice — standard
Languages
English

Reference metadata

Notice subtype
17
Notice version
1
Legal basis
32014L0025

Reference IDs

Tender ID
403361-2026
Source notice ID
e8f9ac03-b7f2-4e25-9062-e7e1bddce6d7

Documents (2)

Similar tenders