Railway signalling, telecommunications and ETCS design-build-maintenance
Original notice title
Empreitada "LC+LAV S&T01-VÁRIOS TROÇOS RFN,CONVENCIONAL E ALTA VELOCIDADE-SINALIZAÇÃO,TELECOMUNICAÇÕES E ETCS-CONCEÇÃO-EXECUÇÃO-MANUTENÇÃO
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
85 / 100
Risk factors
The notice includes 5 lot entries but only LOT-0000 has a title, description, CPV, value, and deadline. The other lots...
Contract duration is 9280 days (~25.4 years), which is unusually long. This may involve long-term maintenance obligatio...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- EUR 360M estimated value
- Works contract
- 3 lots
- Duration 9280 DAY
- Design, execution, and maintenance of railway signalling systems
- Telecommunications infrastructure for railways
Show full summary
Large-scale railway signalling, telecommunications, and ETCS works covering multiple conventional and high-speed rail sections in Portugal. The contract includes design, execution, and maintenance (conceção-execução-manutenção) for various locations (Aveiro, Porto, Leiria, Santarém, Coimbra). The notice indicates a single lot (LOT-0000) with an estimated value of EUR 360M, but structured data includes 5 lot entries with incomplete information. Open procedure, electronic submission required, language Portuguese. Neither procurement documents nor detailed eligibility criteria were analyzed.
Risks
The notice includes 5 lot entries but only LOT-0000 has a title, description, CPV, value, and deadline. The other lots...
Contract duration is 9280 days (~25.4 years), which is unusually long. This may involve long-term maintenance obligatio...
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Open procedure
Administrative
- Electronic submission required (via ANOGOV platform)
- Submission language: Portuguese
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
Infraestruturas de Portugal, SA
Location
Almada, PRT
Identifier
503933813
Lots (3)
LOT-0000
Empreitada "LC+LAV S&T01-VÁRIOS TROÇOS RFN,CONVENCIONAL E ALTA VELOCIDADE-SINALIZAÇÃO,TELECOMUNICAÇÕES E ETCS-CONCEÇÃO-EXECUÇÃO-MANUTENÇÃO
Design, execution, and maintenance of railway signalling, telecommunications, and ETCS for multiple sections of the Portuguese conventional and high-speed railway network (RFN and LAV).
EUR 360M
Estimated value
Location
Duration
Category
Selection criteria
Deadline
Award details
Value note
Show original TED data
Original TED description
Empreitada "LC+LAV S&T01-VÁRIOS TROÇOS RFN,CONVENCIONAL E ALTA VELOCIDADE-SINALIZAÇÃO,TELECOMUNICAÇÕES E ETCS-CONCEÇÃO-EXECUÇÃO-MANUTENÇÃO
Lot 2
Lot 2
Place of performance: Porto (PT11A). No further details provided in structured data.
Lot 3
Lot 3
Place of performance: Leiria (PT16F). No further details provided in structured data.
Procurement Details
- Publication date
- 09 Jun 2026
- Notice type
- Contract notice — standard
- Languages
- Portuguese
Reference metadata
- Notice subtype
- 17
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 396706-2026
- Source notice ID
- a9f7ee3c-3ac2-4964-8a8a-42c0cea23d2d
Documents (2)
Similar tenders
Germany – Railway construction works – SCHÖNEBECK-ELBE Umbau Verkehrsstation
Poland – Construction work – Zaprojektowanie i wykonanie robót dla zadania pn.: "Prace na linii kolejowej C–E 20 na odcinku Pilawa - Łuków"
Poland – Construction work – Zaprojektowanie i wybudowanie linii kolejowej dużych prędkości od Węzła CPK (bez Węzła CPK) do Węzła Bolimowskiego (bez Węzła Bolimowskiego)
Poland – Construction work – Zaprojektowanie i wykonanie robót budowlanych dla zadania pn.: „Prace na linii kolejowej nr 179 na odcinku Tychy – Bieruń Stary” realizowanego w ramach Programu Fundusze Europejskie na Infrastrukturę, Klimat, Środowisko 2021-2027
Poland – Construction work – Wykonanie robót budowlanych w ramach projektu „Budowa odcinka linii kolejowej od stacji Modlin do Mazowieckiego Portu Lotniczego (MPL) Warszawa/Modlin oraz budowa stacji kolejowej Mazowiecki Port Lotniczy (MPL) Warszawa/Modlin”
Poland – Construction work – Wykonanie robót budowlanych na odcinku Wejherowo – Choczewo w ramach projektu pn.: „Zapewnienie dostępu kolejowego do elektrowni jądrowej Lubiatowo – Kopalino”
Opportunity Score
Why this score?
Opportunity
60 / 100
Complexity
85 / 100
Risk factors
The notice includes 5 lot entries but only LOT-0000 has a title, description, CPV, value, and deadline. The other lots...
Contract duration is 9280 days (~25.4 years), which is unusually long. This may involve long-term maintenance obligatio...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications