Tenderwize
Zurück zur Suche

Technischer Dienst. Bau Radweg Abschnitt Stilfserbrücke-Gomagoi (Parks für das Klima 2020 - PNCLI2020-EUAP0017-III-05), Trinkwasser-, Beregnungs- und Stromverrohrungen

Bezirksgemeinschaft Vinschgau·Silandro, Italy·EUR 7.1M·Deadline Jul 15, 2026 · 21 days left·Open·Works·Framework
High valueStructured notice only
60/100

Opportunity Score

Needs reviewMedium complexity
WorksFrameworkOpen
Why this score?

Opportunity

60 / 100

Complexity

55 / 100

Risk factors

No procurement documents were analyzed; key requirements, eligibility, and award details are only referenced.

Structured data shows three lots but only the first has full details; XML notice confirms a single lot. This may cause...

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • EUR 7.1M estimated value
  • Framework procurement
  • Works contract
  • 1 lot
  • Duration 280 DAY
  • Construction of a cycle path (section Ponte Stelvio-Gomagoi) under 'Parks for Climate 2020' program.
  • Installation of irrigation conduits (by Bonifica Val Venosta consortium).
Show full summary

Framework agreement for a joint construction site in Val Venosta, Italy, encompassing a cycle path, irrigation conduits, drinking water pipes, and electrical conduits. Single lot, open procedure, estimated value EUR 7,139,750.86. Document URLs provided but no extracted text analyzed.

Risks

No procurement documents were analyzed; key requirements, eligibility, and award details are only referenced.

Structured data shows three lots but only the first has full details; XML notice confirms a single lot. This may cause...

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Open procedure under Directive 2014/24/EU (D.lgs. 36/2023).
  • Variants not allowed.
  • Framework agreement with re-opening of competition for subsequent contracts.

Requirements may be incomplete.

Award Criteria

Lot 1

Preis (nach Einheitspreisen)20%

Buyer

Name

Bezirksgemeinschaft Vinschgau

Location

Silandro, ITA

Identifier

01340850211

Lots (1)

LOT-0001

Technischer Dienst. Bau Radweg Abschnitt Stilfserbrücke-Gomagoi (Parks für das Klima 2020 - PNCLI2020-EUAP0017-III-05), Trinkwasser-, Beregnungs- und Stromverrohrungen

Framework agreement for the joint construction of a cycle path, irrigation, drinking water, and electrical conduits between Ponte Stelvio and Gomagoi. Includes multiple sub-projects by different administrations.

WorksFrameworkEU fundedElectronic submission

EUR 7.1M

Estimated value

Location

ITH10, Italy

Duration

280 DAY

Category

Cycle path construction work

Selection criteria

Price

Deadline

Deadline Jul 15, 2026

Procurement Details

Publication date
04 Jun 2026
Notice type
Contract notice — standard
Languages
Italian, German

Reference metadata

Notice subtype
16
Notice version
1
Legal basis
32014L0024

Reference IDs

Tender ID
386827-2026
Source notice ID
319a9d4f-7e07-4a4e-927b-6ab74fe5228d

Documents (2)

Similar tenders