BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Gjøvik Kommune·Gjøvik, Norway·NOK 95M | EUR 8.8M·Deadline Jul 31, 2026 · 37 days left·Neg W Call·Supplies
High valueStructured notice only
60/100

Opportunity Score

Needs reviewHigh complexity
SuppliesOpen
Why this score?

Opportunity

60 / 100

Complexity

70 / 100

Risk factors

No procurement documents analyzed – key terms, technical specifications, and conditions unknown.

Strict experience requirements may disqualify tenderers without specific references (e.g., waterproof concrete, deep sh...

No procurement documents available

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • NOK 95M estimated value
  • Supplies contract
  • 1 lot
  • Establishment of a raw water pump station
  • Execution of pipelines from ENT2 up to the land pipeline contract (ENT3)
Show full summary

Gjøvik municipality seeks a supplier for the establishment of a raw water pump station and pipelines as part of a back-up water system (Stage 2). The contract covers works from ENT2 to the land pipeline contract (ENT3). The tender is a negotiated procedure with call for competition, valued at 95,000,000 NOK. Only one lot is identified. Tender documents are available via Artifik but were not analyzed.

Risks

No procurement documents analyzed – key terms, technical specifications, and conditions unknown.

Strict experience requirements may disqualify tenderers without specific references (e.g., waterproof concrete, deep sh...

No procurement documents available

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Tenderers must be a legally established company
  • Sufficient financial capacity (annual accounts for 2024-2025, credit rating)
  • Relevant experience: waterproof concrete constructions, deep sheet pits, pressurized stainless steel pipes Ø500+, pump delivery/installation, steel pipes PN16, welded steel...

Requirements may be incomplete.

Award Criteria

Lot 1

Price criterion

Lot 2

Quality criterion

Lot 3

Quality criterion

Buyer

Name

Gjøvik Kommune

Location

Gjøvik, NOR

Buyer profile

Open profile

Identifier

940155223

Lots (8)

LOT-0001

BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station

Establishment of a raw water pump station and pipelines from ENT2 to the land pipeline contract (ENT3) as part of Stage 2 of the Gjøvik-Biri back-up water system.

SuppliesElectronic submission

Location

Norway

Category

Pipeline, piping, pipes, casing, tubing

Deadline

Deadline Jul 31, 2026

Lot 2

Lot 2

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.

Category

Pumping station construction work

Lot 3

Lot 3

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.

Category

Works related to water-distribution…

Lot 4

Lot 4

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.

Category

Ancillary works for water pipelines

Lot 5

Lot 5

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.

Category

Ancillary works for pipelines and cables

Lot 6

Lot 6

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.

Category

Construction work for water

Lot 7

Lot 7

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.

Category

Construction work for water projects

Lot 8

Lot 8

Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.

Category

Water-treatment work

Procurement Details

Publication date
02 Jun 2026
Notice type
Contract notice — standard
Languages
English, Norwegian

Reference metadata

Notice subtype
17
Notice version
1
Legal basis
32014L0025

Reference IDs

Tender ID
382098-2026
Source notice ID
6afd6de1-85e2-4846-8a58-3d1d02665c8f