IC-INFRAT 03 : REMPLACEMENT D'APPAREILS DE VOIE, REMPLACEMENT DE DEMI-FERRURES (AIGUILLAGES) ET RENOUVELLEMENT DE RAILS ET TRAVERSES
Opportunity Score
Why this score?
Opportunity
40 / 100
Complexity
60 / 100
Risk factors
No contract value or budget is disclosed, making it impossible to gauge the financial scale or profitability.
Selection and award criteria are missing, which may hide important qualitative or financial requirements.
Submission deadline in 9 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 1 lot
- Duration 54 MONTH
- Replacement of 7 tramway track switches at Rouges Barres depot
- Replacement of 18 pairs of half-fittings (switch points) on the common tram corridor
Show full summary
This tender is a private call for tenders by KEOLIS LILLE ILEVIA for tramway infrastructure works in Lille, France, including replacement of track switches, half-fittings (switch points), and renewal of rails and sleepers at the Rouges Barres depot and the common tram corridor. The procedure is an open call, not subject to public procurement code. A single lot is defined. The estimated value is not provided. Duration is 54 months. Submission deadline is 2026-07-03 (time discrepancy between sources: 09:00 vs 11:00). Site visit is mandatory. Advance payment of 10% and retention guarantee of 5% apply. No selection or award criteria are included in the provided data. Procurement documents are available online but were not analyzed.
Risks
No contract value or budget is disclosed, making it impossible to gauge the financial scale or profitability.
Selection and award criteria are missing, which may hide important qualitative or financial requirements.
Submission deadline in 9 days
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Site visit mandatory (details in the consultation regulation)
Administrative
- Electronic submission is required
- Submission language: French
Requirements may be incomplete.
Buyer
Name
KEOLIS LILLE ILEVIA
Location
MARCQ-EN-BARUL, FRA
Buyer profile
Identifier
982 752 909 00027
Lots (1)
LOT-0001
IC-INFRAT 03 : REMPLACEMENT D'APPAREILS DE VOIE, REMPLACEMENT DE DEMI-FERRURES (AIGUILLAGES) ET RENOUVELLEMENT DE RAILS ET TRAVERSES
Replacement of 7 tramway track switches at Rouges Barres depot, replacement of 18 pairs of half-fittings (switch points) on the common tram corridor, and renewal of rails and sleepers at Rouges Barres depot.
Location
Duration
Category
Deadline
Award details
Show original TED data
Original TED description
Voir ci-dessus.
Procurement Details
- Publication date
- 26 May 2026
- Notice type
- Contract notice — standard
- Languages
- French
Reference metadata
- Notice subtype
- 17
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 359713-2026
- Source notice ID
- e47e2c96-68e8-4960-80ef-b37f9ebbac4a
Documents (2)
Similar tenders
Poland – Engineering works and construction works – Rozbudowa układu drogowego wraz z budową linii tramwajowej od Pętli Brynów do planowanej Pętli Kostuchna oraz budową węzła przesiadkowego "Kostuchna"
Romania – Road construction works – Servicii de proiectare, asistență tehnică din partea proiectantului și lucrări de execuție aferente obiectivului de investiții ”Lărgire Bd. Dimitrie Pompeiu cu extindere infrastructura de tramvai si străpungere Bd. Barbu Vacarescu, construire drum de legătură intre Sos. Pipera, Bd. Dimitrie Pompeiu si Str. Fabrica de Glucoza si construire parcare Tip Park&Ride”
Poland – Tramway works – Wykonanie prac w formule „wybuduj” dla zadania pn.: „Budowa torowiska tramwajowego w Sosnowcu w ul. 11 Listopada na odcinku od ronda na skrzyżowaniu ulic 11 Listopada i Marszałka Edwarda Rydza-Śmigłego do skrzyżowania ul. 11 Listopada i Generała Władysława Andersa
Poland – Engineering works and construction works – Rozbudowa układu drogowego wraz z budową linii tramwajowej od Pętli Brynów do planowanej Pętli Kostuchna oraz budową węzła przesiadkowego "Kostuchna"
Opportunity Score
Why this score?
Opportunity
40 / 100
Complexity
60 / 100
Risk factors
No contract value or budget is disclosed, making it impossible to gauge the financial scale or profitability.
Selection and award criteria are missing, which may hide important qualitative or financial requirements.
Submission deadline in 9 days
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications