Tenderwize
Zurück zur Suche

Onshore intervention for gas storage

Gas Storage Denmark A/S·Fredericia, Denmark·EUR 21.4M·Neg W Call·Services·Framework
High valueStructured notice only
Original notice title

Gas Storage Denmark: Onshore Intervention Services related to wells on natural gas storage LOT 1-3: 2027-2034

60/100

Opportunity Score

Needs reviewHigh complexity
ServicesFramework
Why this score?

Opportunity

60 / 100

Complexity

70 / 100

Risk factors

The estimated values are based on historic consumption and prognosis, but the contracting authority is not obliged to p...

If bidding both LOT 1 and LOT 2, supplier may be awarded only one, even if best for both.

Deep Portfolio Analysis

Deep Company Fit Analysis

Uses:

  • Description
  • Industries & Services
  • Capabilities
  • Market & Experience
  • Certifications

Overview

Moderate opportunity

Key Facts

  • EUR 21.4M estimated value
  • Framework procurement
  • Services contract
  • 3 lots
  • Onshore intervention services related to wells on natural gas storage, covering reservoir logging, wireline intervention, coil tubing, well testing, fluid and nitrogen pumping.
  • LOT 1: Pulsed neutron logging, production logging, data interpretation, caliper of tubing, ultrasonic measurement, camera, leak detection.
Show full summary

This tender is for onshore intervention services related to wells on natural gas storage, issued by Gas Storage Denmark A/S. It is divided into three lots: LOT 1 (Reservoir logging and well diagnostics), LOT 2 (Wireline Intervention), and LOT 3 (Coil Tubing, Well testing, Fluid and Nitrogen pumping). The framework agreement is for 8 years with a possibility of termination with 6 months written notice. The procedure is a negotiated procedure with a call for competition. Place of performance is in Denmark (Nyrup and Aalestrup). Submission requires electronic submission via Comdia. The estimated total value is EUR 21,420,000 but consumption estimates are not binding.

Risks

The estimated values are based on historic consumption and prognosis, but the contracting authority is not obliged to p...

If bidding both LOT 1 and LOT 2, supplier may be awarded only one, even if best for both.

Analysis may be incomplete

Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.

Key Requirements

Technical

  • Framework agreement for 8 years with possibility of termination with 6 months written notice.
  • Negotiated procedure with call for competition.

Administrative

  • Electronic submission required via Comdia.

Requirements may be incomplete.

Award Criteria

Lot 1

Price criterion

Lot 2

Quality criterion

Lot 3

Quality criterion

Lot 4

Price criterion

Lot 5

Quality criterion

Lot 6

Quality criterion

Lot 7

Price criterion

Lot 8

Quality criterion

Lot 9

Quality criterion

Buyer

Name

Gas Storage Denmark A/S

Location

Fredericia, DNK

Identifier

29851247

Lots (21)

LOT-0001

LOT 1 - Reservoir logging and well diagnostics

Reservoir logging and well diagnostics covering pulsed neutron, production logging, data interpretation, and other E-line work. Expected consumption EUR 4,360,000; maximum value EUR 6,530,000. Framework agreement for 8 years. Specific selection criteria include minimum equity of EUR 75,000 and reference requirements in pulsed neutron logging and caliper of tubing.

ServicesFrameworkElectronic submission

EUR 4.4M

Estimated value

Location

Denmark

Category

The oil and gas industry

LOT-0002

LOT 2 - Wireline Intervention

Wireline Intervention covering slick line, E-line, and fishing operations. Expected consumption EUR 5,080,000; maximum value EUR 7,620,000. Framework agreement for 8 years.

ServicesFrameworkElectronic submission

EUR 5.1M

Estimated value

Location

Denmark

Category

The oil and gas industry

LOT-0003

LOT 3 - Coil Tubing, Well testing, Fluid and Nitrogen pumping

Coil Tubing, Well testing, Fluid and Nitrogen pumping. Expected consumption EUR 11,980,000; maximum value EUR 17,960,000. Framework agreement for 8 years.

ServicesFrameworkElectronic submission

EUR 12M

Estimated value

Location

Denmark

Category

The oil and gas industry

Lot 4

Lot 4

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Location

Denmark

Category

Well-logging services

Lot 5

Lot 5

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Location

Denmark

Category

Onshore services

Lot 6

Lot 6

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Location

Denmark

Category

Downhole tool services

Lot 7

Lot 7

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Gas extraction

Lot 8

Lot 8

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Other logging services

Lot 9

Lot 9

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Drilling services

Lot 10

Lot 10

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Downhole recording services

Lot 11

Lot 11

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Professional services for the gas industry

Lot 12

Lot 12

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Well-logging services

Lot 13

Lot 13

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Onshore services

Lot 14

Lot 14

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Downhole tool services

Lot 15

Lot 15

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Other logging services

Lot 16

Lot 16

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Drilling services

Lot 17

Lot 17

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Downhole recording services

Lot 18

Lot 18

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Professional services for the gas industry

Lot 19

Lot 19

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Well-logging services

Lot 20

Lot 20

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Onshore services

Lot 21

Lot 21

The Contracting Authority wants to purchase Onshore Intervention Services related to wells on natural gas storage for Gas Storage Denmark. The tendered framework agreement has a duration of 8 years with a possibility of termination with 6 months written notice, see section 9.3 in Framework Agreement (doc. no. 25/18898-5 for LOT 1, doc. no. 25/18899-3 for LOT 2 and doc. no. 25/18900-3 for LOT 3). The agreement is divided into the following lots: LOT 1: Gas Storage Denmark – Onshore Intervention Services - Reservoir logging and well diagnostics (25/18898) LOT 2: Gas Storage Denmark – Onshore Intervention Services - Wireline Intervention covering Slick line, E-line and Fishing operations (25/18899) LOT 3: Gas Storage Denmark – Onshore Intervention Services - Coil Tubing, Well testing, Fluid and Nitrogen pumping (25/18900) The Framework Agreements are to support all of GSD (all locations) and to support both operations and projects. In the upcoming years GSD will evaluate if projects and works involving CO2 and/or hydrogen storage will be pursued. The value of each lot is stated below. The amount is calculated based on historic consumption in combination with a prognosis for the upcoming 8 years. The estimated value for each LOT includes an estimated 3% price adjustment per year over the whole period. The consumption figures are estimates only and are consequently not binding for the Contracting Authority. During the specified period, the Contracting Authority has the right to purchase the services comprised by the framework agreement from the selected tenderer, but is not obligated to do so, cf. the framework sec. 1.3. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.

Category

Downhole tool services

Procurement Details

Publication date
20 May 2026
Notice type
Contract notice — standard
Languages
English

Reference metadata

Notice subtype
17
Notice version
1
Legal basis
32014L0025

Reference IDs

Tender ID
349400-2026
Source notice ID
c48743e7-81e8-45a0-9e61-3e2a0c098753

Documents (1)

Similar tenders