SV-JWA-260423-004 - TW Ausbauvorhaben Föhringer Ring / Isardüker, Microtunneling (Gas, 110kV)
Opportunity Score
Why this score?
Opportunity
45 / 100
Complexity
85 / 100
Risk factors
The project involves microtunneling under a river, canal, and road with multiple utility bundles in difficult ground co...
Only 3-5 candidates will be invited to negotiate, with selection based primarily on references (80%) and concept analys...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Works contract
- 1 lot
- Duration until Feb 2028
- Microtunneling under Isar river, Mittlere-Isar-Kanal, and Munich street with DN2000 pipe (~420m, bundle: gas, 110kV, fiber, empty, cooling pipes)
- Microtunneling under Föhringer Ring with DN1200 pipe (~50m, bundle: gas, 110kV, empty pipe)
Show full summary
This is a negotiated procedure with call for competition for microtunneling works in Munich, Germany, under the EU Utilities Directive (SektVO). The project involves crossing the Isar river, Mittlere-Isar-Kanal, and Munich street using a DN 2000 pipe with a bundle of high-pressure gas, 110 kV power, fiber optics, empty conduits, and cooling lines (approx. 420 m), plus crossing the Föhringer Ring with a DN 1200 pipe (approx. 50 m), including start and target pits. The tender is published by SWM Infrastruktur GmbH & Co. KG. Only one lot is identified. The estimated value is not provided. The deadline for submission of participation requests is 28 May 2026, 13:00 CET. Award is based solely on price (100% weight). Selection criteria include turnover, references, and personnel. Limited to 3-5 candidates. Procurement documents are available for download but were not analyzed.
Risks
The project involves microtunneling under a river, canal, and road with multiple utility bundles in difficult ground co...
Only 3-5 candidates will be invited to negotiate, with selection based primarily on references (80%) and concept analys...
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Written applications not accepted
Administrative
- Electronic submission via SWM supplier portal with prior system registration and request for activation of tender documents
- Tender documents available for download, but activation required for submission and notifications
Requirements may be incomplete.
Award Criteria
Lot 1
Buyer
Name
SWM Infrastruktur GmbH & Co. KG
Location
München, DEU
Identifier
DE 813 865 922
Lots (1)
LOT-0000
SV-JWA-260423-004 - TW Ausbauvorhaben Föhringer Ring / Isardüker, Microtunneling (Gas, 110kV)
Microtunneling: crossing Isar/Mittlere-Isar-Kanal/Munich street with DN2000 pipe (gas, 110kV, fiber, empty, cooling) ~420m, and crossing Föhringer Ring with DN1200 pipe (gas, 110kV, empty) ~50m, including start and target pits.
Location
Category
Deadline
Award details
Value note
Show original TED data
Original TED description
Unterquerung der Isar, des Mittlere-Isar-Kanals und der Münchner Straße im Rohrvortriebsverfahren mit einem Vortriebsrohr DN 2000 mit einem Rohrbündel aus Erdgas-HD, Strom (110 kV), LWL, Leerrohr und Kühlleitungen auf einer Länge von ca. 420 m, inkl. Herstellung Start- und Zielgruben; Unterquerung der Föhringer Rings im Rohrvortriebsverfahren mit einem Vortriebsrohr DN 1200 mit einem Rohrbündel aus Erdgas-HD, Strom (110 kV) und einem Leerrohr auf einer Länge von ca. 50 m, inkl. Herstellung Start- und Zielgruben.
Procurement Details
- Publication date
- 27 Apr 2026
- Notice type
- Contract notice — standard
- Languages
- German
Reference metadata
- Notice subtype
- 17
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 290328-2026
- Source notice ID
- fe954ed7-5101-4f64-966f-a1b9f598acf9
Documents (1)
Similar tenders
Germany – Construction work for tunnels – Kiesbergtunnel - Ausführung konstruktive Gewerke
Denmark – Construction work for bridges and tunnels, shafts and subways – SST04 - Tunnel og Konstruktioner (1)
Denmark – Construction work for bridges and tunnels, shafts and subways – SST04 - Tunnel og Konstruktioner
Germany – Construction work for tunnels – A44 - Sanierung Tunnel Hopfenberg und Tunnel Walberg, AS HeLi Mitte - AS HeLi Ost - Los 1 Technische Tunnelausstattung
Opportunity Score
Why this score?
Opportunity
45 / 100
Complexity
85 / 100
Risk factors
The project involves microtunneling under a river, canal, and road with multiple utility bundles in difficult ground co...
Only 3-5 candidates will be invited to negotiate, with selection based primarily on references (80%) and concept analys...
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications