Prüfsystem für Gas-isolierte Schaltanlagen im Hoch- und Höchstspannungsnetz der Austrian Power Grid AG
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
40 / 100
Risk factors
Critical information such as selection criteria, required documents, and submission deadline is missing from the availa...
As a pre-qualification system, competition may be high, and qualification does not guarantee contracts.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications
Overview
Moderate opportunityKey Facts
- Supplies contract
- 1 lot
- Duration 9 YEAR
- Establishment of a pre-qualification system (Prüfsystem) for gas-insulated switchgear (GIS) for high and extra-high voltage networks.
- The system is expected to run for 9 years, from April 2026 to December 2035.
Show full summary
This tender establishes a pre-qualification system (Prüfsystem) for gas-insulated switchgear (GIS) for the high and extra-high voltage grid of Austrian Power Grid AG. It is a supplies contract with a single lot, covering a 9-year duration from April 2026 to December 2035. The tender is published under the utilities directive (2014/25/EU) and requires electronic submission via the APG procurement portal (vemap). No estimated value, award criteria, or detailed eligibility requirements are provided in the available data.
Risks
Critical information such as selection criteria, required documents, and submission deadline is missing from the availa...
As a pre-qualification system, competition may be high, and qualification does not guarantee contracts.
Analysis may be incomplete
Only part of the procurement documentation was analyzed. Additional eligibility requirements, certificates, or submission documents may exist in the remaining tender documentation.
Key Requirements
Technical
- Participation is open to suppliers of gas-insulated switchgear for high and extra-high voltage.
Administrative
- Electronic submission via the APG procurement portal (Open portal) is required.
- Submissions must be in German (DEU).
Requirements may be incomplete.
Buyer
Name
Austrian Power Grid AG
Location
Wien, AUT
Website
Buyer profile
Identifier
FN177696v
Lots (1)
LOT-0001
Prüfsystem für Gas-isolierte Schaltanlagen im Hoch- und Höchstspannungsnetz der Austrian Power Grid AG
Establishment of a pre-qualification system for gas-insulated switchgear for the high and extra-high voltage network.
Location
Duration
Category
Award details
Value note
Show original TED data
Original TED description
Einrichtung eines Prüfsystems (Präqualifikationsverfahren) für Gas-isolierte Schaltanlagen im Hoch- und Höchstspannungsnetz der Austrian Power Grid AG
Procurement Details
- Publication date
- 07 Apr 2026
- Notice type
- Qu Sy
- Languages
- German
Reference metadata
- Notice subtype
- 15
- Notice version
- 1
- Legal basis
- 32014L0025
Reference IDs
- Tender ID
- 238517-2026
- Source notice ID
- fa1472e3-e70e-4785-bed3-f044261bd1ab
Documents (1)
Similar tenders
Slovakia – Repair and maintenance services of transformers – Oprava transformátorov T1, T2, T34, T56 a T78 VE Gabčíkovo
Czechia – Construction work – Výstavba dobíjecích stanic pro bezemisní vozidla MHD
Germany – Construction work – Generalsanierung Kreiskrankenhaus Heppenheim - Blitzschutzanlage
Poland – Electricity distribution and control apparatus – Dostawy zabezpieczeń pola dla Stacji Elektroenergetycznej 400/110 kV Jarosław Systemowa.
Germany – Automation system – Einführung eines Niederspannungscockpits und Automatisierung von Ortsnetzstationen
Bulgaria – Electricity distribution and control apparatus – „Доставка на сигнализатори на земни и къси съединения с дистанционно предаване на данните, за кабелни електропроводи средно напрежение (СрН), с непосочно действие“, реф. №PPD 26-050
Opportunity Score
Why this score?
Opportunity
50 / 100
Complexity
40 / 100
Risk factors
Critical information such as selection criteria, required documents, and submission deadline is missing from the availa...
As a pre-qualification system, competition may be high, and qualification does not guarantee contracts.
Deep Portfolio Analysis
Uses:
- Description
- Industries & Services
- Capabilities
- Market & Experience
- Certifications